Precaution
Explanation
Know and accommodate the
machine shipping weight.
Use lifting and moving equipment appropriate for the machine
shipping weight, as shown on the Bill of Lading. To obtain the
shipping weight in advance, contact the Milnor
®
Transportation
department.
Use only lifting eyes for crane
lifting.
Machines designed for crane lifting are provided with lifting
eyes either on the structural frame or on the shell, hidden be-
hind cosmetic panels.
Use long cables or a spreader
bar for crane lifting.
Leave the machine skidded as
long as possible.
If the machine is skidded, leave the machine on the skids until
the machine is as close as possible to its final location. Use care
to avoid contact between the fork lift forks and fragile machine
components on the un-skidded machine.
Protect fragile or sensitive ma-
chine components.
After the machine is uncovered, carefully find and read all tags
on the outside of the machine. White and manila paper tags are
installation precautions. See the Installation Tag Guidelines in
the installation manual for additional information.
Prepare the foundation and in-
stall anchor bolts correctly.
Anchor bolt sizes and locations are shown on the dimensional
drawing in the back of the installation manual. However, Mil-
nor
®
recommends to use the actual machine as a template to ac-
curately locate where the anchor bolts are to be installed in the
foundation. See the anchor bolt detail on the dimensional draw-
ing. It is not permissible to omit anchor bolts.
Handling a Washer-extractor from Delivery to Final Location
29
Содержание MWF100C7
Страница 2: ......
Страница 8: ......
Страница 9: ...Installation 1 5 ...
Страница 43: ...Service and Maintenance 2 39 ...
Страница 55: ...2 Drive Assemblies 2 1 51 ...
Страница 64: ...Pellerin Milnor Corporation Bearing Assembly 4840F MWF100 MWF125 2 of 6 60 ...
Страница 71: ...2 Suspension Assemblies 2 2 67 ...
Страница 74: ......
Страница 75: ...2 Tilt Assemblies 2 3 71 ...
Страница 80: ......
Страница 81: ...2 Door Assemblies 2 4 77 ...
Страница 89: ...2 Water Steam Drain 2 5 85 ...
Страница 97: ...2 Chemical Supply Assemblies 2 6 93 ...
Страница 102: ......
Страница 103: ...2 Pneumatic Assemblies 2 7 99 ...
Страница 107: ...2 Control and Sensing Assemblies 2 8 103 ...
Страница 109: ...Reference 3 105 ...
Страница 110: ......
Страница 111: ...3 Dimensional Drawings 3 1 107 ...
Страница 112: ......
Страница 113: ...109 ...
Страница 114: ......
Страница 115: ...111 ...
Страница 116: ...112 ...