Pellerin Milnor Corporation
27
Precaution
Explanation
Leave the machine skidded as
long as possible.
If the machine is skidded, leave the machine on the skids until
the machine is as close as possible to its final location. Use care
to avoid contact between the fork lift forks and fragile machine
components on the un-skidded machine.
Protect fragile or sensitive ma-
chine components.
After the machine is uncovered, carefully find and read all tags
on the outside of the machine. White and manila paper tags are
installation precautions. See the Installation Tag Guidelines in
the installation manual for additional information.
Prepare the foundation and in-
stall anchor bolts correctly.
Anchor bolt sizes and locations are shown on the dimensional
drawing in the back of the installation manual. However, Mil-
nor
®
recommends to use the actual machine as a template to ac-
curately locate where the anchor bolts are to be installed in the
foundation. See the anchor bolt detail on the dimensional draw-
ing. It is not permissible to omit anchor bolts.
Set the machine at the correct
height and level.
Use blocking to get the machine base level and the base pads a
minimum of 1” (25 mm) above the floor. Example:
Apply machinery grout evenly
so that support is distributed.
Fill all voids between the foundation and each base pad with in-
dustrial strength, non-shrinking grout. Allow the grout to fully
cure per the grout instructions.
Tighten anchors alternately so
that the hold-down force is
distributed.
Raise the machine slightly and remove the wood blocking. In-
stall a flat washer and nut on each anchor bolt and tighten in-
crementally in an alternating pattern. After tightening, check
each anchor at least twice.
Содержание 30015V8Z
Страница 2: ......
Страница 5: ...Pellerin Milnor Corporation iii Tables Table 1 Trademarks 6 Contents ...
Страница 6: ...4 Pellerin Milnor Corporation 1 General Information ...
Страница 37: ...4 Dimensional Drawings 30015 and 30022 T6X Short base 10 bolt Pellerin Milnor Corporation 35 ...
Страница 38: ...This page intentionally blank ...
Страница 39: ......
Страница 40: ......
Страница 41: ......
Страница 42: ......
Страница 43: ...5 Dimensional Drawings 30015 and 30022 VRJ V8Z VZZ Short base 10 bolt Pellerin Milnor Corporation 41 ...
Страница 44: ...This page intentionally blank ...
Страница 45: ......
Страница 46: ......
Страница 47: ......
Страница 48: ......
Страница 49: ......
Страница 50: ......
Страница 51: ......
Страница 52: ......
Страница 53: ......
Страница 54: ......
Страница 55: ......
Страница 56: ......
Страница 57: ...6 Dimensional Drawings Pedestals Pellerin Milnor Corporation 55 ...
Страница 58: ...This page intentionally blank ...
Страница 59: ......