![Milnor 30015V8Z Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/milnor/30015v8z/30015v8z_installation-manual_1797088013.webp)
Pellerin Milnor Corporation
11
Paper tags on the machine provide installation guidelines and precautions. The tags can be tie-on
or adhesive. You can remove tie-on tags and white, adhesive tags after installation. Yellow adhe-
sive tags must remain on the machine.
The following entries explain the installation tags. Each entry includes: 1) the tag illustration, 2)
the tag part number at the bottom of the tag, and 3) the meaning of the tag.
Display or Action
Explanation
Read the manuals before proceeding. This symbol appears on
most tags. The machine ships with safety, operator, and routine
maintenance guides for customer use. Milnor dealer manuals for
installing, commissioning, and servicing the machine are also
available from the Milnor Parts department.
B2TAG88005: This carefully built product was tested and in-
spected to meet Milnor performance and quality standards by
(identification mark of tester).
B2TAG94081: Motor must rotate in this direction. On single mo-
tor washer-extractors and centrifugal extractors, the drive motor
must turn in this direction during draining and extraction. This tag
is usually wrapped around a motor housing. If the motor turns in
the opposite direction when the machine is first tested, the electri-
cal hookup is incorrect and must be reversed as explained in the
schematic manual.
B2TAG94097: The cylinder must rotate
counterclockwise
during
draining and extraction (spin) when viewed from here (rear of ma-
chine). Otherwise, reverse the electric power connections, as ex-
plained in the schematic manual.
B2TAG94099: Do not strike the shell door when fork-lifting. This
can cause the door to leak.
B2T2001013: Hot water connection.
Содержание 30015V8Z
Страница 2: ......
Страница 5: ...Pellerin Milnor Corporation iii Tables Table 1 Trademarks 6 Contents ...
Страница 6: ...4 Pellerin Milnor Corporation 1 General Information ...
Страница 37: ...4 Dimensional Drawings 30015 and 30022 T6X Short base 10 bolt Pellerin Milnor Corporation 35 ...
Страница 38: ...This page intentionally blank ...
Страница 39: ......
Страница 40: ......
Страница 41: ......
Страница 42: ......
Страница 43: ...5 Dimensional Drawings 30015 and 30022 VRJ V8Z VZZ Short base 10 bolt Pellerin Milnor Corporation 41 ...
Страница 44: ...This page intentionally blank ...
Страница 45: ......
Страница 46: ......
Страница 47: ......
Страница 48: ......
Страница 49: ......
Страница 50: ......
Страница 51: ......
Страница 52: ......
Страница 53: ......
Страница 54: ......
Страница 55: ......
Страница 56: ......
Страница 57: ...6 Dimensional Drawings Pedestals Pellerin Milnor Corporation 55 ...
Страница 58: ...This page intentionally blank ...
Страница 59: ......