OM-4401 Page 42
9-3.
Run-In Procedure Using Resistance Grid
S-0684
Stop engine.
Do not touch hot exhaust
pipe, engine parts, or load
bank/grid.
Keep exhaust and pipe away
from flammables.
Do not perform run-in
procedure at less than 20
volts weld output and do not
exceed duty cycle or equip-
ment damage may occur.
1
Resistance Grid
Use grid sized for generator rated
output.
Turn Off grid.
2
Welding Generator
3
Weld Cables
Connect grid to generator weld
output terminals using proper size
weld cables with correct connec-
tors (polarity is not important).
4
Voltmeter
5
Clamp-On Ammeter
Connect voltmeter and ammeter as
shown, if not provided on generator.
Start engine and run for several
minutes.
Set grid switches and then adjust
generator V/A control so load
equals 225 amps at 30 volts.
Check generator and meters after
first five minutes then every fifteen
minutes to be sure generator is
loaded properly.
Check oil level frequently dur-
ing run-in; add oil if needed.
After one hour (minimum), place
V/A control in minimum position,
then shut down grid to remove load.
Run engine several minutes at no
load.
Stop engine and let cool.
6
Engine Exhaust Pipe
Repeat procedure if wetstacking is
present.
1
3
5
+
4
2
6
Содержание Trailblazer Pro 350 D
Страница 4: ......
Страница 23: ...OM 4401 Page 19 Notes...
Страница 42: ...OM 4401 Page 38 SECTION 8 ELECTRICAL DIAGRAMS Figure 8 1 Circuit Diagram For Welding Generator...
Страница 43: ...OM 4401 Page 39 198 518 A...
Страница 64: ......
Страница 65: ......
Страница 66: ......