Installation
*INSTALLATION*
57
Installation – flush-fit
Preparing the worktop
Create the worktop cutout.
Remember to maintain the minimum
safety distances (see “Installation –
Safety distances”).
Seal any cut surfaces on
wooden
worktops
with a special varnish,
silicone sealant or resin to prevent the
wood from swelling as a result of
moisture ingress. The sealant must
be heat-resistant.
Make sure that the sealant does not
come into contact with the top of the
worktop.
For wooden worktops, secure the
wooden frame 5.5 mm below the
upper edge of the worktop.
For CS 7611 FL, the wooden frame
must be secured 7 mm under the
upper edge of the worktop.
Fitting the spacer bars
Use the middle screw holes if one of the
following SmartLine elements is
installed to the right or left of the spacer
bar: CS 7611, CS 7641, CS 7101(-1),
CS 7102(-1)
Wooden worktops
Position the spacer bars flush onto
the lower step of the stepped cutout.
Secure the spacer bars with the
3.5 x 25 mm wood screws supplied.
Natural stone worktops
You will need heavy-duty double-
sided tape (not supplied) to secure the
spacer bars.
Stick the tape onto the lower step of
the stepped cutout.
Position the spacer bars flush onto
the lower step of the stepped cutout.
Press the spacer bars firmly into
place.
Содержание SmartLine CS 7102-1
Страница 20: ...Guide to the appliance 20 Burner a Burner cap b Burner head c Burner base d Thermocouple e Ignition electrode ...
Страница 32: ...32 ...
Страница 66: ......
Страница 68: ...M Nr 11 507 780 01 en AE SA CS 7102 1 ...