Peak load cut-out
If the peak-load cut out function is activated the heating will
switch itself off and any programme running will be stopped.
The following message will appear in the display:
Cottons
Normal
Drying
0:43 h
Peak load
Once the peak load has finished the programme will continue
automatically as before.
Service interval
If after switching the machine the following message appears
in the display the machine will need to be serviced by the
Miele Service Department.
Service interval 1
Call the Miele Service Department.
;
OK
H
Press short cut button
D
or wait approx. 5 seconds to
return to the main menu.
Problem solving guide
42
Содержание PT 7186 Vario
Страница 57: ...57 ...
Страница 58: ...58 ...
Страница 59: ...59 ...
Страница 60: ...Alteration rights reserved 1213 M Nr 07 529 112 01 ...