background image

             

 

 

17 | 

P a g e                                                                 1 0 - 3 3 1 - 2   R E V A

 

 

MNChinook 200M Instructions

 

 

 
MIDNITE SOLAR INC. LIMITED WARRANTY 
 
MidNite Solar Power electronics, sheet metal enclosures and accessories 
MidNite Solar Inc. warrants to the original customer that its products shall be free from defects 
in materials and workmanship. This warranty will be valid for a period of five (5) years for all 
products except the MNBRAT Charge Controller, MNBIRDHOUSE1 batteries, 
and MNChinook turbines. These will be two (2) years. 
MidNite  Solar  will  not  warranty  third  party  inverter  components  used  in  MidNite's  pre-wired 
systems. Those components are warranted by the original manufacturer. 
 
At its option, MidNite Solar will repair or replace at no charge any MidNite product that 
proves to be defective within such warranty period. This warranty shall not apply if the 
MidNite Solar product has been damaged by unreasonable use, accident, negligence, 
service or modification by anyone other than MidNite Solar, or by any other causes 
unrelated to materials and workmanship. The original consumer purchaser must retain 
original purchase receipt for proof of purchase as a condition precedent to warranty 
coverage. To receive in-warranty service, the defective product must be received no later 
than two (2) weeks after the end of the warranty period. The product must be accompanied 
by proof of purchase and Return Authorization (RA) number issued by MidNite Solar. 
For an RMA number contact MidNite Solar Inc., 17722 67th Ave NE, Arlington, WA 98223 (360) 
403-7207. Purchasers must prepay all delivery costs or shipping charges to return any defective 
MidNite Solar product under this warranty policy. Except for the warranty that the products are 
made in accordance with, the specifications therefore supplied or agreed to by customer: 
 
MIDNITE SOLAR MAKES NO WARRANTY EXPRESSED OR IMPLIED, AND ANY IMPLIED 
WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE WHICH 
EXCEEDS THE FOREGOING WARRANTY IS HEREBY DISCLAIMED BY MIDNITE SOLAR 
AND EXCLUDED FROM ANY AGREEMENT MADE BY ACCEPTANCE OF ANY ORDER 
PURSUANT TO THIS QUOTATION. MIDNITE SOLAR WILL NOT BE LIABLE FOR ANY 
CONSEQUENTIAL DAMAGES, LOSS OR EXPENSE ARISING IN CONNECTION WITH THE 
USE OF OR THE INABILITY TO USE ITS GOODS FOR ANY PURPOSE WHATSOEVER. 
MIDNITE SOLAR’S MAXIMUM LIABILITY SHALL NOT IN ANY CASE EXCEED THE 
CONTRACT PRICE FOR THE GOODS CLAIMED TO BE DEFECTIVE OR UNSUITABLE. 
 
Products will be considered accepted by customer unless written notice to the contrary is 
given to MidNite Solar within ten (10) days of such delivery to customer. MIDNITE SOLAR is not 
responsible for loss or damage to products owned by customer and located on MIDNITE 
SOLAR’S premises caused by fire or other casualties beyond MIDNITE SOLAR’s control. This 
warranty is in lieu of all other warranties expressed or implied. 
 
MIDNITE SOLAR INC. 17722 67TH AVE NE ARLINGTON, WA 98223 
 
Email: 
[email protected] 
[email protected] 
PH: 360-403-7207 FAX: 360-691-6862 

Содержание Chinook 200 Marine

Страница 1: ...e clean renewable electricity anywhere the wind blows Available in 12 24 and 48 Volt models Innovative design axial flux alternator using neodymium iron boron magnets Powder coated stamped aluminum ch...

Страница 2: ...nook 200M Instructions Contents Disclaimer 3 Introduction 3 Safety Precautions 4 Specifications 5 Package Contents 6 Mechanical Assembly 7 Electrical Installation 11 Turbine Operation 14 Maintenance 1...

Страница 3: ...USA by MidNite Solar Inc 17722 67 th AVE NE Arlington WA 98223 PH 360 403 7207 Fax 360 691 6862 www MidniteSolar com Introduction Please read this manual thoroughly before attempting to assemble insta...

Страница 4: ...l installation process This will prevent the turbine from spinning up during the installation Never install the turbine upside down or in any orientation other than that depicted on the installa tion...

Страница 5: ...INOOK200M Nominal Voltage 12 24V 48V DC Rotor Blades Glass Reinforced Nylon Rotor Diameter 1 Meter 3 28 Feet Rated Wind Velocity 14m s 31 30 mph Rated Output 200 Watts Max Output 250 Watts Start up Wi...

Страница 6: ...o come Package Contents Your Chinook 200M Turbine will arrive containing the components shown below If any of the components are missing or damaged please contact your dealer immediately 3 Blades 1 Tu...

Страница 7: ...tely 100 hours of normal operation for the bearing seals to Break in and the lubrication to be distributed correctly around the bearing raceways and ball cages During this period you may notice a redu...

Страница 8: ...skin Rotor Blade Assembly Take the three rotor blades and rotor hub plate Be careful when handling the blades they may have sharp edges Use a 10mm socket hexagon key and three M6 x 18mm long cap screw...

Страница 9: ...spaced equally Fit the Rotor Blade Assembly The assembled and balanced rotor blades can now be fitted to the Chi nook 200M chassis This is done by placing the rotor hub plate against the bearing hous...

Страница 10: ...and batteries will be located Follow the table below to select the correct wire size This will vary depending on your nominal battery voltage and the distance that the cables will be run Careful selec...

Страница 11: ...e may be different ways of wiring small wind turbines photovoltaic panels charge controllers and batteries together This type of system will often expand organically but the following guidelines shoul...

Страница 12: ...inst the buildup of static and lightning strikes The turbine mount should be grounded separately with its own ground rod and an appropriate surge arrestor installed to help prevent damage to the batte...

Страница 13: ...ries are fully charged or not Depending on the size of the dump load the turbine may slow down or stall during a period when the power is being diverted Larger capacity battery banks will be able to s...

Страница 14: ...acceptable limits the CDL will stop diverting current to the dump load Refer to the CDL controller user manual for specific operating instructions Shut Down By activating the optional stop switch if...

Страница 15: ...w set of rotor blades should be installed Contact MidNite Solar for replacements Inspect the roots of the blades attachment tabs for signs of stress cracking or fatigue A new set of rotor blades shoul...

Страница 16: ...inook 200M turbine Rotor Blades sold only in sets of 3 Slip Ring Wiper set of 2 Slip Ring sold only with yaw mount assembly Stator 48VDC Stator 24VDC Stator 12VDC Bridge Rectifier Yaw Bearing Housing...

Страница 17: ...umber issued by MidNite Solar For an RMA number contact MidNite Solar Inc 17722 67th Ave NE Arlington WA 98223 360 403 7207 Purchasers must prepay all delivery costs or shipping charges to return any...

Отзывы:

Похожие инструкции для Chinook 200 Marine