MNChinook 200M Instructions

 

 
Maintenance 

 

Please follow the preventive maintenance program listed below. This will ensure that the turbine operates 
reliably and safely with good efficiency. 

 

Always shut down the turbine before attempting to carry out maintenance.   

 

Post-Installation Checks (to be carried out one month after installation): 

 

 

Check that the turbine mount pin is secure and has not worked loose. Adjust if required.   

 

Ensure that the rotor hub is still securely fitted.   

 

Ensure that the rotor blades rotate freely.   

 

Monitor the output. Ensure that the turbine and charge controller are functioning correctly.   

 

Annual Maintenance: 

 

 

Inspect the tower / support structure.   

 

Remove the turbine from its installation to a suitable workbench.   

 

Remove the rotor blade assembly.   

 

Inspect the edges of the rotor blades for damage such as dents or chips. The blades will become 
unbalanced if they are damaged. This will cause vibration, noise and poor performance. If many 
dents have occurred along the edges of the blades, a new set of rotor blades should be installed 
(Contact MidNite Solar for replacements).   

 

Inspect the roots of the blades (attachment tabs) for signs of stress cracking or fatigue. A new set of 
rotor blades should be installed if any cracks of fractures have occurred.   

 

Remove any build-up dirt and debris from the rotor blades using mild detergent in warm water.   

 

Check the blade hub for excessive play.   

 

Check and rebalance the rotor blades as required.   

 

Check that all electrical connections are sound and free from corrosion.   

 

Generally ensure that the turbine is in good working condition and is safe for continued use.   

 

After Five years of normal operation: 

 

 

We recommend that the rotor bearing and rotor blades should be replaced after five years of continuous 
operation. This will ensure that the tur

bine’s performance and safety are not compromised. 

 

            Other Considerations: 

 

o

 

The equipment used in the charging system (batteries, charge controller, PV panels, etc) should be 
maintained according to the instructions provided by the equipment manufacturer.   

o

 

Where lead acid batteries are used, it is especially important that they are maintained carefully. Failure 
to do so will result in the batteries being rendered useless within a short period of time.   

 

 

 

 

 

 

 

 

Содержание Chinook 200 Marine

Страница 1: ...e clean renewable electricity anywhere the wind blows Available in 12 24 and 48 Volt models Innovative design axial flux alternator using neodymium iron boron magnets Powder coated stamped aluminum ch...

Страница 2: ...nook 200M Instructions Contents Disclaimer 3 Introduction 3 Safety Precautions 4 Specifications 5 Package Contents 6 Mechanical Assembly 7 Electrical Installation 11 Turbine Operation 14 Maintenance 1...

Страница 3: ...USA by MidNite Solar Inc 17722 67 th AVE NE Arlington WA 98223 PH 360 403 7207 Fax 360 691 6862 www MidniteSolar com Introduction Please read this manual thoroughly before attempting to assemble insta...

Страница 4: ...l installation process This will prevent the turbine from spinning up during the installation Never install the turbine upside down or in any orientation other than that depicted on the installa tion...

Страница 5: ...INOOK200M Nominal Voltage 12 24V 48V DC Rotor Blades Glass Reinforced Nylon Rotor Diameter 1 Meter 3 28 Feet Rated Wind Velocity 14m s 31 30 mph Rated Output 200 Watts Max Output 250 Watts Start up Wi...

Страница 6: ...o come Package Contents Your Chinook 200M Turbine will arrive containing the components shown below If any of the components are missing or damaged please contact your dealer immediately 3 Blades 1 Tu...

Страница 7: ...tely 100 hours of normal operation for the bearing seals to Break in and the lubrication to be distributed correctly around the bearing raceways and ball cages During this period you may notice a redu...

Страница 8: ...skin Rotor Blade Assembly Take the three rotor blades and rotor hub plate Be careful when handling the blades they may have sharp edges Use a 10mm socket hexagon key and three M6 x 18mm long cap screw...

Страница 9: ...spaced equally Fit the Rotor Blade Assembly The assembled and balanced rotor blades can now be fitted to the Chi nook 200M chassis This is done by placing the rotor hub plate against the bearing hous...

Страница 10: ...and batteries will be located Follow the table below to select the correct wire size This will vary depending on your nominal battery voltage and the distance that the cables will be run Careful selec...

Страница 11: ...e may be different ways of wiring small wind turbines photovoltaic panels charge controllers and batteries together This type of system will often expand organically but the following guidelines shoul...

Страница 12: ...inst the buildup of static and lightning strikes The turbine mount should be grounded separately with its own ground rod and an appropriate surge arrestor installed to help prevent damage to the batte...

Страница 13: ...ries are fully charged or not Depending on the size of the dump load the turbine may slow down or stall during a period when the power is being diverted Larger capacity battery banks will be able to s...

Страница 14: ...acceptable limits the CDL will stop diverting current to the dump load Refer to the CDL controller user manual for specific operating instructions Shut Down By activating the optional stop switch if...

Страница 15: ...w set of rotor blades should be installed Contact MidNite Solar for replacements Inspect the roots of the blades attachment tabs for signs of stress cracking or fatigue A new set of rotor blades shoul...

Страница 16: ...inook 200M turbine Rotor Blades sold only in sets of 3 Slip Ring Wiper set of 2 Slip Ring sold only with yaw mount assembly Stator 48VDC Stator 24VDC Stator 12VDC Bridge Rectifier Yaw Bearing Housing...

Страница 17: ...umber issued by MidNite Solar For an RMA number contact MidNite Solar Inc 17722 67th Ave NE Arlington WA 98223 360 403 7207 Purchasers must prepay all delivery costs or shipping charges to return any...

Отзывы: