
20
7.7 Balance refrigerant of the 2-way, 3-way valves
Procedure:
1. Confirm that both the 2-way and 3-way valves are set to the open position.
2. Connect the charge set to the 3-way valve
’
s service port.
Leave the valve on the charge set closed.
Connect the charge hose with the push pin to the service port.
3. Open the valves (Low side) on the charge set and discharge the refrigerant until the gauge
indicates 0.05 to 0.1Mpa.
If there is no air in the refrigeration cycle [the pressure when the air conditioner is not running is
higher than 0.1Mpa, discharge the refrigerant until the gauge indicates 0.05 to 0.1 Mpa. If this is the
case, it will not be necessary to apply an evacuation.
Discharge the refrigeration gradually; if it is discharged too suddenly, the refrigeration oil still be
discharged.
Содержание MSY-09HRDN1-QC2
Страница 10: ...7 3 2 Outdoor Unit MOA 09HDN1 QC2 MOB4 12HDN1 QC2...
Страница 11: ...8 MOC 09HDN1 QC8 MOC 12HDN1 QC4 MOC 18HDN1 QC2...
Страница 15: ...12 5 Refrigerant cycle diagram...
Страница 17: ...14 6 2 Outdoor Unit MOC 09HDN1 QC8 MOC 12HDN1 QC4 MOA 09HDN1 QC2...
Страница 18: ...15 MOB4 12HDN1 QC2 MOC 18HDN1 QC2...
Страница 44: ...41...