
18
7.5 Pumping down (Re-installation)
Procedure
1. Confirm that both the 2-way and 3-way valves are set to the opened position.
Remove the valve stem caps and confirm that the valve stems are in the opened position.
Be sure to use a hexagonal wrench to operate the valve stems.
2. Operate the unit for 10 to 15 minutes.
3. Stop operation and wait for 3 minutes, then connect the charge set to the service port of the
3-way valve.
Connect the charge hose with the push pin to the gas service port.
5. Air purging of the charge hose.
Open the low-pressure valve on the charge set slightly to purge air from the charge hose.
6. Set the 2-way valve to the close position.
7. Operate the air conditioner at the cooling cycle and stop it when the gauge indicates
0.1MPa.
8. Immediately set the 3-way valve to the closed position.
Do this quickly so that the gauge ends up indicating 0.3 to 0.5Mpa.
Disconnect the charge set, and amount the 2-way and 3-way valve
’
s stem nuts and service
port caps.
Use a torque wrench to tighten the service port cap to a torque of 1.8 kgf.m.
Be sure to check for gas leakage.
Содержание MSY-09HRDN1-QC2
Страница 10: ...7 3 2 Outdoor Unit MOA 09HDN1 QC2 MOB4 12HDN1 QC2...
Страница 11: ...8 MOC 09HDN1 QC8 MOC 12HDN1 QC4 MOC 18HDN1 QC2...
Страница 15: ...12 5 Refrigerant cycle diagram...
Страница 17: ...14 6 2 Outdoor Unit MOC 09HDN1 QC8 MOC 12HDN1 QC4 MOA 09HDN1 QC2...
Страница 18: ...15 MOB4 12HDN1 QC2 MOC 18HDN1 QC2...
Страница 44: ...41...