Service manual
24
8.5
Pumping down (Re-installation)
Procedure
1. Confirm that both the 2-way and 3-way valves are set to the opened position.
§
Remove the valve stem caps and confirm that the valve stems are in the opened position.
§
Be sure to use a hexagonal wrench to operate the valve stems.
2. Operate the unit for 10 to 15 minutes.
3. Stop operation and wait for 3 minutes, then connect the charge set to the service port of the
3-way valve.
§
Connect the charge hose with the push pin to the gas service port.
4. Air purging of the charge hose.
§
Open the low-pressure valve on the charge set slightly to purge air from the charge hose.
5. Set the 2-way valve to the close position.
6. Operate the air conditioner at the cooling cycle and stop it when the gauge indicates 0.1MPa.
7. Immediately set the 3-way valve to the closed position.
§
Do this quickly so that the gauge ends up indicating 0.3 to 0.5Mpa.
8. Disconnect the charge set, and amount the 2-way and 3-way valve’s stem nuts and service
port caps.
§
Use a torque wrench to tighten the service port cap to a torque of 1.8 kg.m.
§
Be sure to check for gas leakage.
Содержание MSH-07CR
Страница 1: ...Cover MSH 07CR MSH 07HR MSH 09CR MSH 09HR MSH 12CR MSH 12HR MSH 16CR MSH 16HR MSH 18CR ...
Страница 10: ...Service manual 9 5 Refrigerant cycle diagram Ø Cooling only Ø Heat pump mode ...
Страница 12: ...Service manual 12 7 Schematic diagram and Wiring diagram 7 1 Schematic diagram ...
Страница 13: ...Service manual 13 7 2 Wiring diagram 7 2 1 MSH 07CR MSH 09CR ...
Страница 14: ...Service manual 14 ...
Страница 15: ...Service manual 15 7 2 2 MSH 12CR ...
Страница 16: ...Service manual 16 7 2 3 MSH 16CR ...
Страница 17: ...Service manual 17 7 2 4 MSH 18CR ...
Страница 18: ...Service manual 18 7 2 4 MSH 07HR MSH 09HR ...
Страница 19: ...Service manual 19 7 2 5 MSH12HR ...
Страница 20: ...Service manual 20 7 2 6 MSH 16HR ...