Service manual
21
8.
Installation details
8.1
Wrench torque sheet for installation
Outside diameter
Torque
mm
inch
Kg.m
φ
6.35
1/4
1.8
φ
9.52
3/8
4.2
φ
12.7
1/2
5.5
8.2
Connecting the cables
The power cord of connect should be selected according to the following specifications sheet.
Grade
Unit
7K
9K
12K
16K
18K
mm
2
1.0
1.0
1.5
2.5
2.5
8.3
Pipe length and the elevation
Pipe size
Capacity
Btu/h
GAS
LIQUID
Standard
length (m)
Max.
ElevationB
(m)
Max.
ElevationB
(m)
Additional
refrigerant
(g/m)
3/8’’ (
φ
9.52)
1/4’’ (
φ
6.35)
5
5
10
30
7k~12K
1/2’’ (
φ
12.7)
1/4’’ (
φ
6.35)
5
5
10
30
1/2’’ (
φ
12.7)
1/4’’ (
φ
6.35)
5
8
15
30
5/8’’ (
φ
15.88)
1/4’’ (
φ
6.35)
5
10
20
30
18K~28K
5/8’’ (
φ
15.88)
3/8’’ (
φ
9.52)
5
10
20
65
Содержание MSH-07CR
Страница 1: ...Cover MSH 07CR MSH 07HR MSH 09CR MSH 09HR MSH 12CR MSH 12HR MSH 16CR MSH 16HR MSH 18CR ...
Страница 10: ...Service manual 9 5 Refrigerant cycle diagram Ø Cooling only Ø Heat pump mode ...
Страница 12: ...Service manual 12 7 Schematic diagram and Wiring diagram 7 1 Schematic diagram ...
Страница 13: ...Service manual 13 7 2 Wiring diagram 7 2 1 MSH 07CR MSH 09CR ...
Страница 14: ...Service manual 14 ...
Страница 15: ...Service manual 15 7 2 2 MSH 12CR ...
Страница 16: ...Service manual 16 7 2 3 MSH 16CR ...
Страница 17: ...Service manual 17 7 2 4 MSH 18CR ...
Страница 18: ...Service manual 18 7 2 4 MSH 07HR MSH 09HR ...
Страница 19: ...Service manual 19 7 2 5 MSH12HR ...
Страница 20: ...Service manual 20 7 2 6 MSH 16HR ...