30
Close the valve on the charging cylinder and discharge the refrigerant by loosening the flare nut on the
2-way valve approximately 45’ until the gauge indicates 0.3 to 0.5 Mpa.
6). Disconnect the charge set and the charging cylinder, and set the 2-way and 3-way valves to the open
position.
Be sure to use a hexagonal wrench to operate the valve stems.
7). Mount the valve stems nuts and the service port cap.
Be sure to use a torque wrench to tighten the service port cap to a torque 18N.m.
Be sure to check the gas leakage.
6.7 Re-installation while the outdoor unit need to be repaired
1. Evacuation for
the whole system
Procedure:
1).
Confirm that both the 2-way and 3-way valves are set to the opened position.
2). Connect the vacuum pump to 3-way valve’s service port.
3). Evacuation for approximately one hour
Confirm that the compound meter indicates -0.1Mpa.
4). Close the valve (Low side) on the charge set, turn off the vacuum pump, and confirm that the gauge
needle does not move (approximately 5 minutes after turning off the vacuum pump).
Содержание MOA-11HN1-QB8
Страница 1: ...LUNA ON OFF SERIES Service Manual 2014 9ASEU B1 1401...
Страница 16: ...14 MS9A 12HRN1 QC7G...
Страница 17: ...15 MS9A 18HRN1 QC5...
Страница 18: ...16 MS9A 24HRN1 QB8W...
Страница 20: ...18 MOC 17HN1 QC0...
Страница 21: ...19 MOC 18HN1 QC0 MOF3 18HN1 QC5...
Страница 22: ...20 MOP 24HN1 QB8W...
Страница 23: ...21 MOF1 24HN1 QB8W...