Vacuum Drying and Leakage Checking
100
Installation
shall cause shutdown of unit. When this situation happens, the normal startup only can be recovered by
turning down power supply and eliminating accumulated water.
Note:
Drain plug at the main water-containing plate is used for eliminating accumulated water in
water-containing plate when maintaining air conditioner fault. During normal operation, the plug shall be
filled in to prevent leakage.
6.4 Insulation work of drainage pipe
Refer the introduction to the insulation engineering parts.
7. Vacuum Drying and Leakage Checking
7.1 Purpose of vacuum drying
Eliminating moisture in system to prevent the phenomena of ice-blockage and copper oxidation.
Ice-blockage shall cause abnormal operation of system, while copper oxide shall damage compressor.
Eliminating the non-condensable gas (air) in system to prevent the components oxidizing, pressure
fluctuation and bad heat exchange during the operation of system.
7.2 Selection of vacuum pump
The ultimate vacuum degree of vacuum pump shall be -756mmHg or above.
Precision of vacuum pump shall reach 0.02mmHg or above.
7.3 Operation procedure for vacuum drying
Due to different construction environment, two kinds of vacuum drying ways could be chosen, namely
ordinary vacuum drying and special vacuum drying.
7.3.1 Ordinary vacuum drying
1. When conduct first vacuum drying, connect pressure gauge to the infusing mouth of gas pipe and liquid
pipe, and keep vacuum pump running for 1hour (vacuum degree of vacuum pump shall be reached
-755mmHg).
2 If the vacuum degree of vacuum pump could not reach -755mmHg after 1 hour of drying, it indicates
that there is moisture or leakage in pipeline system and need to go on with drying for half an hour.
3 If the vacuum degree of vacuum pump still could not reach -755mmHg after 1.5 hours of drying, check
whether there is leakage source.
4 Leakage test: After the vacuum degree reaches -755mmHg, stop vacuum drying and keep the pressure
for 1 hour. If the indicator of vacuum gauge does not go up, it is qualified. If going up, it indicates that
there is moisture or leak source.
7.3.2 Special vacuum drying
The special vacuum drying method shall be adopted when:
1. Finding moisture during flushing refrigerant pipe.
2. Conducting construction on rainy day, because rain water might penetrated into pipeline.
3. Construction period is long, and rain water might penetrated into pipeline.
4. Rain water might penetrate into pipeline during construction.
Procedures of special vacuum drying are as follows:
1. Vacuum drying for 1 hour.
2. Vacuum damage, filling nitrogen to reach 0.5Kgf/cm2 .
Because nitrogen is dry gas, vacuum damage could achieve the effect of vacuum drying, but this
method could not achieve drying thoroughly when there is too much moisture. Therefore, special
attention shall be drawn to prevent the entering of water and the formation of condensate water.
3. Vacuum drying again for half an hour.
If the pressure reached -755mmHg, start to pressure leakage test. If it can not reached the value,
repeat vacuum damage and vacuum drying again for 1 hour.
Содержание MHF-18HWN1-Q
Страница 1: ...Contents i R410A ON OFF SERIES Service Manual 2013 LEUS B 1306...
Страница 2: ......
Страница 4: ......
Страница 16: ...Service Space 12 Duct Type 3 Service Space Ensure enough space required for installation and maintenance...
Страница 17: ...Wiring Diagrams Duct Type 13 4 Wiring Diagrams MHF 18HWN1 Q...
Страница 18: ...Wiring Diagrams 14 Duct Type MHF 24HWN1 Q...
Страница 19: ...Wiring Diagrams Duct Type 15 MHF 30HWN1 Q MHF 36HWN1 Q...
Страница 20: ...Wiring Diagrams 16 Duct Type MHF 30HWN1 R MHF 36HWN1 R MHF 48HWN1 R MHF 60HWN1 R...
Страница 21: ...Wiring Diagrams Duct Type 17...
Страница 27: ...Field Wiring Duct Type 23 10 Field Wiring MHF 18HWN1 Q...
Страница 32: ...Service Space 28 Ceiling Floor Type 3 Service Space...
Страница 33: ...Wiring Diagrams Ceiling Floor Type 29 4 Wiring Diagrams MUE 36HRN1 Q...
Страница 34: ...Wiring Diagrams 30 Ceiling Floor Type MUE 36HRN1 R MUE 48HRN1 R MUE 60HRN1 R...
Страница 37: ...Field Wiring Ceiling Floor Type 33 9 Field Wiring MUE 36HRN1 Q...
Страница 38: ...Field Wiring 34 Ceiling Floor Type MUE 36HRN1 R MUE 48HRN1 R MUE 60HRN1 R...
Страница 44: ...Dimensions 40 Super slim Cassette Type 2 Dimensions Model A H 18 30 205 235 36 48 245 275 60 287 317...
Страница 45: ...Service Space Super slim Cassette Type 41 3 Service Space 1000mm 1000mm 1000mm 1000m m...
Страница 46: ...Wiring Diagrams 42 Super slim Cassette Type 4 Wiring Diagrams MCD 18HRN1 Q...
Страница 47: ...Wiring Diagrams Super slim Cassette Type 43 MCD 24HDN1 Q...
Страница 48: ...Wiring Diagrams 44 Super slim Cassette Type MCD 36HDN1 R...
Страница 49: ...Wiring Diagrams Super slim Cassette Type 45 MCD 48HDN1 R MCD 60HDN1 R...
Страница 54: ...Field Wiring 50 Super slim Cassette Type 9 Field Wiring MCD 18HRN1 Q...
Страница 55: ...Field Wiring Super slim Cassette Type 51 MCD 24HRN1 Q MCD 36HRN1 R MCD 48HRN1 R MCD 60HRN1 R...
Страница 60: ...Wiring Diagrams 56 High Static Pressure Duct Type 4 Wiring Diagrams MHG 24HWN1 Q...
Страница 61: ...Static Pressure High Static Pressure Duct Type 57 5 Static Pressure 24 000Btu h...
Страница 66: ...Field Wiring 62 High Static Pressure Duct Type 10 Field Wiring MHG 24HWN1 Q...
Страница 73: ...Wiring Diagrams Outdoor Units 69 4 Wiring Diagrams MOU 18HN1 Q...
Страница 74: ...Wiring Diagrams 70 Outdoor Units MOU 24HN1 Q MOU 30HN1 Q...
Страница 75: ...Wiring Diagrams Outdoor Units 71 MOU 30HN1 R MOU 36HN1 Q...
Страница 76: ...Wiring Diagrams 72 Outdoor Units MOU 36HN1 R...
Страница 77: ...Wiring Diagrams Outdoor Units 73 MOU 48HN1 R...
Страница 78: ...Wiring Diagrams 74 Outdoor Units MOUA 60HN1 R...