INDOOR UNIT INSTALLATION
>1000mm
>1000mm
Chart 3
A
Drain side
Tubing side
(Unit: mm)
780(Hook-location)
840(Body)
880(Ceiling hole)
950(Panel)
A. The existing ceiling (to be horizontal)
a. Please cut a quadrangular hole of 880
880mm in the ceiling according to the shape of the installation
paper board. (Refer to Chart3, 4)
The center of the hole should be at the same position of that of the air conditioner body.
Determine the lengths and outlets of the connecting pipe, drainpipe and cables.
To balance the ceiling and to avoid vibration, please enforce the ceiling when necessary.
b. Please select the position of installation hooks according to the hook holes on the installation board.
Drill four holes of 12mm, 45~50mm deep at the selected positions on the ceiling. Then embed the
expansible hooks (fittings).
Face the concave side of the installation hooks toward the expansible hooks. Determine the length
of the installation hooks from the height of ceiling, then cut off the unnecessary part.
If the ceiling is extremely high, please determine the length of the installation hook according to facts.
×
φ
Necessary room
outlet
intlet
outlet
ground
Chart 1
Chart 4
Note:
18000-24000Btu/h(R410A)
Series A 260mm
30000-48000Btu/h(R410A)
Series A 330mm
≥
≥
Nut
Body
Ceiling
880mm
Hook
Panel
Chart 2
Body
Chart 5
Central hole
Bolt M6X12
Installation paper board
1. Install the main body
5
18000-24000Btu/h(R407C)
Series A 260mm
36000-48000Btu/h(R407C)
Series A 330mm
≥
≥
30000Btu/h(R407C,3 PHASE) Series A 260mm
30000Btu/h(R407C,1 PHASE) Series A 330mm
≥
≥
Note:
18000-24000Btu/h(R410A)
Series A 260mm
30000-48000Btu/h(R410A)
Series A 330mm
≥
≥
18000-24000Btu/h(R407C)
Series A 260mm
36000-48000Btu/h(R407C)
Series A 330mm
≥
≥
30000Btu/h(R407C,3 PHASE) Series A 260mm
30000Btu/h(R407C,1 PHASE) Series A 330mm
≥
≥