PERIODIC MAINTENANCE 

(Continued)

Continue draining water for about fifteen (15) seconds from control, until water is clean. 
Manually close valve.  Recheck gauge glass.  If water level has dropped significantly, wait for
the boiler to restore water level and pressure and repeat if necessary.  

1. Observe that the water in gauge glass is clean and clear.  Extreme murkiness in water

indicates inadequate water quality.

2. Safety valve should be tripped during operation once a week to assure that it functions

properly.

3. Keep all exposed cleanable areas of unit clean at all times.

CAUTION:  Take extra caution when blowing down water level

control or tripping safety valve as extreme hot water and live steam

are present.

DESCALING BOILER

It is recommended that the boiler be checked every 90 to 120 days for scale build up.  Regular
maintenance should be carried out at this time.

1. 

With boiler empty, close manual blowdown valve.  If appliance is equipped with Automatic
Blowdown, turn water supply to appliance OFF.  Turn power switch ON.  This will energize
and close blowdown valve. 

2.

Remove 3/4" pipe plug from fitting on left front of boiler.  

3.

Insert appropriate hose or tube through fitting and pour in (½) half gallon (U.S.) of CLR
Descaling Solution.

If available, use the Optional Deliming assembly DPA-1 available from your dealer.

CAUTION:  If heater does not shut off during blowdown, immediately

discontinue use of appliance and call for service.

Содержание CROWN OB-2-1-27-E

Страница 1: ...e instructions thoroughly before installing or servicing this equipment IMPORTANT FOR FUTURE REFERENCE Please complete this information and retain this manual for the life of the equipment Model _____...

Страница 2: ...WARNING Improper installation operation adjustment alteration service or maintenance can cause property damage injury or death Read the installation operating and maintenance instructions thoroughly...

Страница 3: ...OF CONTENTS DESCRIPTION PAGE Important Notes for Installation and Operation 2 1 0 Service Connections 4 2 0 Installation Instructions 6 3 0 Operating Instructions 9 4 0 CSD 1 Optional Feature 10 5 0...

Страница 4: ...INSTALLATION AND OPERATION MANUAL OYSTER BAR ELECTRIC MODELS OB 2 1 27 E OB 2 2 27 E OB 4 1 48 E OB 4 2 54 E PART NUMBER 10103R1 4 2005 03 23 1 0 SERVICE CONNECTIONS...

Страница 5: ...INSTALLATION AND OPERATION MANUAL OYSTER BAR ELECTRIC MODELS OB 2 1 27 E OB 2 2 27 E OB 4 1 48 E OB 4 2 54 E PART NUMBER 10103R1 5 2005 03 23 1 0 SERVICE CONNECTIONS...

Страница 6: ...ible shipping damage If the appliance is found to be damaged save the packaging material and contact the carrier within 15 days of delivery Before installing verify the electrical rating agrees with t...

Страница 7: ...choring devices not supplied 5 Place appliance back in the installation position 6 Place carpenter s level on top appliance and re level side to side and front to back 7 Bolt and anchor appliance secu...

Страница 8: ...Connection The incoming cold water supply connection at the rear of the boiler cabinet requires 3 8 tubing and water pressure of 25 50 psig A manual shut off valve must be provided convenient to the...

Страница 9: ...water quality the owner must supply proper water to the boiler see page 4 Water Level Control While boiler is ON briefly open the water level control valve once a day to remove any sediment that might...

Страница 10: ...it Once the water in the boiler has reached the proper level the level control will stop the flow of water to the boiler As water is consumed in the production of steam the level control will supply a...

Страница 11: ...DBY pilot light amber will come on High Pressure Condition A high pressure safety switch is installed on the boiler Should the pressure exceed the limit of this device the boiler will be shut down and...

Страница 12: ...mber by blowing down the control so that the accumulation of sediment does not interfere with the movement of the float in the control Control must be flushed at least once a day CAUTION Protect yours...

Страница 13: ...of unit clean at all times CAUTION Take extra caution when blowing down water level control or tripping safety valve as extreme hot water and live steam are present DESCALING BOILER It is recommended...

Страница 14: ...allow two hours for descaling and cleaning DO NOT TURN ON STEAM to attached appliances or to upper compartment 7 Open both the blowdown and low water level control valves for complete drainage After...

Страница 15: ...k drain valve is closed 5 Supply water pressure too low Automatic blowdown valve does not drain 1 Defective blowdown valve 2 Heat exchanger build up of scale clogging drain lines and valve Boiler achi...

Страница 16: ...es Fahrenheit 135 degrees Celsius In the initial stages of the cooking process when the steam comes in contact with the cold kettle bowl surface it condenses and forms considerable amounts of water A...

Отзывы: