background image

INSTALLATION AND OPERATION MANUAL, OYSTER BAR (ELECTRIC), 

MODELS:  OB-2-1-27-E, OB-2-2-27-E, OB-4-1-48-E, OB-4-2-54-E

PART NUMBER 10103R1

9

2005-03-23

3.0  OPERATING INSTRUCTIONS

For CSD-1 equipped boilers, see section 4.0 CSD-1 Optional Feature for proper operating
instructions.

BOILER CONTROLS (Inside Cabinet)

Main Power Switch 

ON fills the boiler tank and turns the boiler heaters on.  You should
allow 20 minutes to fill the tank and generate steam.

OFF shuts off the boiler heaters and opens the Automatic
Blowdown Valve, emptying the boiler tank and releasing water and
steam to the drain.  This should be done daily to remove sediment,
lime, or scale.

Pilot Light

-

Indicates main power is ON.

Boiler Pressure Gauge -

Should read 9 - 11 psig during operation; 0 psig during shutdown.

Water Level Sight Glass-

Observe level of water and water quality in the boiler.  Murkiness in
the water indicates inadequate water quality; the owner must supply
proper water to the boiler (see page 4).

Water Level Control

-

While boiler is ON, briefly open the water level control valve once a
day to remove any sediment that might accumulate.  (See page 12
for detailed instructions.)

Safety Valve  -

This valve will release (pop off) if the boiler has too much pressure. 
Once a week, this valve should be tripped during operation to make
sure it functions properly.

OPERATION OF THE BOILER

Turn on water and power supply.

Open cabinet door and turn main power switch ON.  Pilot light ignites and water begins to fill
boiler - observe water gauge sight glass to verify that proper water level is reached.

Once the proper water level is reached, the heaters begin to heat the water.  Heaters require
about 15 minutes to begin steam generation.  The boiler pressure gauge in the cabinet should
indicate steam pressure in a range of 9 to 11 psig.

SHUT DOWN

Turn the Main Power Switch OFF:  Open manual drain valve.  If unit is supplied with Automatic
Blowdown Valve, it will open, draining the boiler and releasing hot water and steam to the drain.

Содержание CROWN OB-2-1-27-E

Страница 1: ...e instructions thoroughly before installing or servicing this equipment IMPORTANT FOR FUTURE REFERENCE Please complete this information and retain this manual for the life of the equipment Model _____...

Страница 2: ...WARNING Improper installation operation adjustment alteration service or maintenance can cause property damage injury or death Read the installation operating and maintenance instructions thoroughly...

Страница 3: ...OF CONTENTS DESCRIPTION PAGE Important Notes for Installation and Operation 2 1 0 Service Connections 4 2 0 Installation Instructions 6 3 0 Operating Instructions 9 4 0 CSD 1 Optional Feature 10 5 0...

Страница 4: ...INSTALLATION AND OPERATION MANUAL OYSTER BAR ELECTRIC MODELS OB 2 1 27 E OB 2 2 27 E OB 4 1 48 E OB 4 2 54 E PART NUMBER 10103R1 4 2005 03 23 1 0 SERVICE CONNECTIONS...

Страница 5: ...INSTALLATION AND OPERATION MANUAL OYSTER BAR ELECTRIC MODELS OB 2 1 27 E OB 2 2 27 E OB 4 1 48 E OB 4 2 54 E PART NUMBER 10103R1 5 2005 03 23 1 0 SERVICE CONNECTIONS...

Страница 6: ...ible shipping damage If the appliance is found to be damaged save the packaging material and contact the carrier within 15 days of delivery Before installing verify the electrical rating agrees with t...

Страница 7: ...choring devices not supplied 5 Place appliance back in the installation position 6 Place carpenter s level on top appliance and re level side to side and front to back 7 Bolt and anchor appliance secu...

Страница 8: ...Connection The incoming cold water supply connection at the rear of the boiler cabinet requires 3 8 tubing and water pressure of 25 50 psig A manual shut off valve must be provided convenient to the...

Страница 9: ...water quality the owner must supply proper water to the boiler see page 4 Water Level Control While boiler is ON briefly open the water level control valve once a day to remove any sediment that might...

Страница 10: ...it Once the water in the boiler has reached the proper level the level control will stop the flow of water to the boiler As water is consumed in the production of steam the level control will supply a...

Страница 11: ...DBY pilot light amber will come on High Pressure Condition A high pressure safety switch is installed on the boiler Should the pressure exceed the limit of this device the boiler will be shut down and...

Страница 12: ...mber by blowing down the control so that the accumulation of sediment does not interfere with the movement of the float in the control Control must be flushed at least once a day CAUTION Protect yours...

Страница 13: ...of unit clean at all times CAUTION Take extra caution when blowing down water level control or tripping safety valve as extreme hot water and live steam are present DESCALING BOILER It is recommended...

Страница 14: ...allow two hours for descaling and cleaning DO NOT TURN ON STEAM to attached appliances or to upper compartment 7 Open both the blowdown and low water level control valves for complete drainage After...

Страница 15: ...k drain valve is closed 5 Supply water pressure too low Automatic blowdown valve does not drain 1 Defective blowdown valve 2 Heat exchanger build up of scale clogging drain lines and valve Boiler achi...

Страница 16: ...es Fahrenheit 135 degrees Celsius In the initial stages of the cooking process when the steam comes in contact with the cold kettle bowl surface it condenses and forms considerable amounts of water A...

Отзывы: