Midco Economite 400B-02 Series Скачать руководство пользователя страница 5

CAUTION: Do not

add any power consum-
ing devices in the low
voltage circuit as over-
loading of the trans-
former can result. Do
not use Motor Relay to
operate any external
devices as the extra
load could damage the
relay contacts.

Note:

If any of the original

wiring as supplied with the
conversion burner must be
replaced, it must be replaced
with type TFF wire or its
equivalent.

CAUTION: The available gas pressure should be within the limits shown in

the SPECIFICATIONS section. Excessive pressure will damage Combination
Valve and Regulator. If the supply pressure exceeds the 14.0" W.C. maximum, a
suitable intermediate main regulator must be installed ahead of the Main
Manual Shut-Off Valve shown in Figure 6.

The burner gas supply piping should branch off from the main line as close to the gas meter as

possible. Do not connect to the bottom of a horizontal section. Use new black pipe and malleable fit-
tings free of cutting and threading burrs or defects.

Provide a sediment trap, union and 1/8" pressure tap in piping close to burner as shown in Fig 6.

Use pipe joint compound approved for use with Liquid Petroleum Gases.
Piping must comply with local codes.
To obtain the maximum firing rate of 400 MBH, the NATURAL gas supply piping must be sized to

provide minimum of 5.0" W.C. pressure (11.0" W.C. PROPANE) to the inlet of the Combination Valve
when the burner and all other gas utilization equipment are on.

Note:

If there is more than 1.0" W.C.

differential in the inlet pressure to
the burner compared to when all

other gas utilization equipment are
off, refer to Section IX, last para-
graph "

CAUTION...

".

CAUTION:  Because it is

difficult to accurately control
pressure during supply pipe
leak test, it is recommended

that the Combination Valve
be disconnected. Exposing

the Combination Valve to pressures over 1/2 PSIG (14.0" W.C.) will damage the
valve and void all warranties.

DANGER: Explosion hazard.

Do not use oxygen for pressure testing.

An explosion could occur during initial start-up.

If the burner piping must be rearranged because of space limitations, be sure to carry out

the general arrangement shown in Figure 6. Install the Combination Valve in any position
except up-side down.

When the burner is installed in jacketed equipment, it is recommended that the

Combination Valve be left adjacent to the burner within the vestibule and the Main Manual
Shut-Off Valve be installed outside.

5

Figure 5:

Wiring Diagram

Pipe 
Size

3

/

4

1

1

1

/

4

1

1

/

2

250

400
400

300
350
400
400

200
200
350
400

400

200
300
400

400

200
300

400
400

Type

of Gas

NATURAL

PROPANE

NATURAL

PROPANE

NATURAL

PROPANE

NATURAL

Capacity-MBH

Length of Pipe

Table 2: Supply Pipe Capacities in MBH

10

20

40

60

100

V Electrical

Continued

VI Piping

(Terminal call-out may not be as shown)

Содержание Economite 400B-02 Series

Страница 1: ...tion equipment and remove such hazards Affix this manual adjacent to the conversion burner CODE COMPLIANCE IS THE SOLE RESPONSIBILITY OF THE INSTALLER WARNING If the information in these instructions...

Страница 2: ...g provision must be made for an outside air supply near the gas utilization equipment area Install permanently open grilles sized at not less than one square inch free area per 4 000 BTU of burner inp...

Страница 3: ...NG Burner cabinet must be mounted in orientation shown in figures 1 and 2 Any other mountings may cause a dangerous condition and will void burner warranty and agency approvals Non standard arrangemen...

Страница 4: ...rsely affect burner operation or if flue gas spillage might introduce a hazard If such a device is used it shall be of the listed type and installed and adjusted by a qual ified service technician in...

Страница 5: ...of 5 0 W C pressure 11 0 W C PROPANE to the inlet of the Combination Valve when the burner and all other gas utilization equipment are on Note If there is more than 1 0 W C differential in the inlet p...

Страница 6: ...and install the spud with the correct orifice size stamped with inch diameter from the SPUD KIT bag If the required firing rate is at the minimum of a capacity range select the next lower range spud...

Страница 7: ...ustment 8 Turn operating control to ON or set thermostat above room temperature Main flame should come on when the motor reaches operating speed If not refer to Trouble Chart To make a preliminary set...

Страница 8: ...C for NATUR AL gas 8 0 W C for PROPANE 1 Standby gas pressure inches W C 2 The efficiency of the thermocouple and the pilotstat safety control can be determined by timing the safety shut off With the...

Страница 9: ...te and electrical interlock switch so as to prevent the burner from firing if the Blower Wheel is not running at its operat ing speed When the motor is off the actuator spring forces the disk against...

Страница 10: ...u 5 for the method of isolating the problem If on a call for heat the main burner fails to operate even though the pilot is burning and the motor is running failure of the electric valve operator s ma...

Страница 11: ...t flame gas pressure See Section IX Venturi Casting and Pilot E Clogged pilot orifice s See Section IX Venturi Casting and Pilot F Defective ignitor ignitor wires spark rod or improper spark gap See F...

Страница 12: ...ent closed too far D Dirty Blower Wheel A Electric Valve Operator s of Combination Valve is defective and entire valve must be replaced Normal low voltage Motor running 24V minimum Combination Valve e...

Отзывы: