9
Electnical Connection Box
F
astener
Control Room
Fig. 7
6.2.2 Installation in Flowing Water
(
e.g. river channel,
reservoir area, etc.
)
The water-calming equipments are required.
Method one: Insert a steel tube in the water channel (see Fig. 8).
The steel tube wall should be thicker, and several holes should be made
at different heights on the tube to damp waves and clear the water
pressure influence.
Method two: Superficial burying is better in the sand and stone channel.
(see Fig.9).
Содержание MPM489W
Страница 1: ...MPM489W Operation Manual...
Страница 12: ...10 Ele ctn ical Co nnec tio n Bo x Fig 8 ELectnical Connection Box Fig 9 Method three see Fig 10...
Страница 19: ......
Страница 20: ......