LVS-7510 Integrated System Installation and Quick Start Guide for Zebra Printers
LVS-7510 Integrated System Installation and Quick Start Guide for Zebra Printers
Page 5 of 16
Step 1: Inspect System Components
Open the shipping boxes containing the LVS-7510 Integrated System and carefully remove the contents. Verify
the items listed below are included with your system and that each item is clean and in proper condition. Contact
your Omron Microscan representative if any items are missing or damaged in transit.
Calibrated
Conformance
Standard Test Card (NIST Traceable)
USB cable for LVS-7510 Integrated System readhead (2.0 certified, 6 feet/1.8 m)
Power supply (5-volts)
AC Line Cord
Light Tower Interface Unit Package. Contents include:
o
Light Tower Interface Unit
o
USB
Cable
o
Power Supply (24-volts)
LVS-7510 installation flash drive (includes LVS-7510 Integrated System software and “LVS-7510 Integrated
System Operations Manual”)
“LVS-7510 Integrated System Installation and Quick Start Guide for Zebra Printers” (this document)
WARNING:
The LVS-7510 Integrated System is packaged with two power supplies with different
voltages (5-volt and 24-volt). The 5-volt power supply connects to the LVS-7510 readhead and the
24-volt power supply connects to the light tower. Take special care when plugging in each power
supply as using the wrong power supply results in system failure.
The customer is responsible for providing the following:
Thermal
labels
Light tower mounting solution
After system inspection is complete, continue to
Step 2: Connect the Cables
.