Video Wall Installation Manual V155, V170, V180
Page 6
Rev. 04/2019
Step 1 – Building Frame Structure
The Side Rails have gussets already
preassembled to speed assembly.
•
Loosen the square nut preinstalled on
each gusset as shown in figure 1A.
•
Position the Top Rail (Part A), Bottom
Rail (Part B), Middle Rail (if supplied)
and Side Rails (Part S) as shown in
figure 1B.
•
Slide the Top Rail (Part A), Bottom Rail
(Part B), and Middle Rail (if supplied) so
the square nuts are inside the top t-
slots of rails and they are flush with
surface of Side Rails as shown in figure
1C.
•
Tighten the screws on all gussets using
6mm Hex Allen Wrench.
NOTE:
For V180 model there is a middle rail.
Fig. 1A
Fig. 1B
Fig. 1C