Video Wall Installation Manual – 4WX2H, 5WX2H
Page 19
Rev. 09/2019
Step 7 –Mounting Monitors to Frame Structure
Instructions
Diagrams
IMPORTANT:
Before mounting any monitors
recheck to ensure all hardware has
been tightened to prevent any
physical damage to monitors falling
or personal injury.
•
In previous Step 1, the Panel VESA
Brackets (Part D) should have been
attached to back of monitors at the
VESA mount locations.
Fig. 7A
Monitors are to be installed onto frame
structure in alphabetical order as shown in
figure 7B.
•
Install bottom row of monitors first and
make any necessary adjustments as
shown in Step. 8
•
Then install next row and make any
necessary adjustments as shown in
Step 8.
•
Repeat for each row.
TIP: Use the thickness of two (2) business
card as the ideal separation gap (1mm)
between video monitors one above the
other.
Fig. 7B
•
To mount monitors, lift them one at a
time and slightly tilt monitor then insert
the downward pointing tab at top of
each Panel VESA Bracket into the T-slot
of top of rail. See figures 7C and 7D.
•
Make sure both Panel VESA Brackets
are inserted properly otherwise
monitor may fall. See figure 7E.
•
Once monitors are mounted to rail,
they can be moved sideways by simply
sliding them on the rail.
•
Repeat for all remaining monitors to be
mounted.
Fig. 7C Fig. 7D
Fig. 7E