Video Wall Installation Manual – 4WX2H, 5WX2H
Page 10
Rev. 09/2019
Step 3 – Building Frame Structure
•
Position the Top Rails (Part A), Bottom
Rails (Part B), Side Rail (Part S) and
Middle Rail (Part M) as shown in figure
3A.
•
Slide the Top Rail (Part A) into the T-slot
of both Side Rail (Part S) and Middle
Rail by sliding the QC connector into
the Side Rails. See figure 3B.
IMPORTANT: Ensure the Square Nuts
previously inserted in bottom of rails do
not fall out
.
•
The Top Rail must be positioned the
same distance as measurement A from
the very top of Side Rail. See figure 3D.
Example:
If measurement A is 5cm, then the Top
Rail must be positioned 5 cm from top
of Side Rail.
•
Once in place, tighten the hex bolt that
is on the left side of Top Rail using a
6mm Allen wrench (not supplied). See
figure 3C.
IMPORTANT
Do not tighten the hex bolt on right side
yet.
Fig. 3A
Fig. 3B Fig. 3C
Fig 3D