Checklists and Logs
Appendix D
9-27
Remove emitter-detector block (including test mass, spring, and
flexure). Note orientation of emitter-detector block.
Wear plastic gloves when handling test mass.
Remove spring from test mass (count number of spring turns
holding upper anchor to main spring).
Put lower lock nut on new flexure assembly.
Remove broken flexure-anchor.
Screw new flexure-anchor into spring (to original position).
Thread pulling tool through one nut, top lever, and down center
tube.
Thread tool into top of flexure (coarse adjustment screw of main
spring assembly).
Pull tool up until spring hangs.
Thread test mass onto lower main spring anchor.
Tighten lower anchor.
Pull tool to lift test mass and guide coarse adjustment tool through
top lever.
Содержание FG5
Страница 19: ...Design Components and Function 2 Figure 2 8 Top view of interferometer optics and beam path 2 11 ...
Страница 20: ...Design Components and Function 2 Figure 2 9 Side view of interferometer optics and beam path 2 12 ...
Страница 22: ...Design Components and Function 2 Figure 2 10 The Superspring 2 14 ...
Страница 31: ...Design Components and Function 2 Figure 2 13 Rotation Monitor 2 23 ...
Страница 32: ......
Страница 42: ...How to Set Up and Run the FG5 3 3 10 ...
Страница 44: ...How to Set Up and Run the FG5 3 Figure 3 2 V Post 3 12 ...
Страница 53: ...How to Set Up and Run the FG5 3 1 Backup the data 2 Shut off computer power 3 21 ...
Страница 87: ...Adjustment and Maintenance 4 4 29 ...
Страница 91: ...Adjustment and Maintenance 4 4 33 ...
Страница 104: ...Troubleshooting 5 5 2 ...
Страница 117: ...Troubleshooting 5 5 15 ...
Страница 131: ...Checklists and Logs Appendix D 9 3 ...
Страница 140: ...Checklists and Logs Appendix D Table 9 6 Replacing Drive Belt 9 12 ...
Страница 145: ...Checklists and Logs Appendix D Table 9 10 Replace Linear Bearings 9 17 ...
Страница 149: ...Checklists and Logs Appendix D Table 9 13 Replace Shaft Encoder 9 21 ...