6.
Initial
Operation
Close
the
operator
3
x
400
V
star
connection
(standard,
pluggable)
The
motor
is
factory-wired
for
connection
to
a
3
x
400
V
mains
supply
in
star
connection.
☞
Place
the
cap
on
the
operator.
☞
Screw
the
cap
on
tightly.
A
B
C
D
E
☞
Place
the
cover
over
the
cap.
☞
Screw
the
cover
on
tightly.
F
G
☞
Connect
all
the
cables
required.
8
–
Roll-Up
Door
Operator
/
MDF
/
Rev.
0.0
Содержание MDF 05-10-15
Страница 1: ...Operating Instructions for Roll Up Door Operators MDF GB Roll Up Door Operator MDF Rev 0 0 1...
Страница 20: ...9 Technical data MDF 20 22 12 KU Crank MDF 20 15 17 KU Crank 20 Roll Up Door Operator MDF Rev 0 0...
Страница 21: ...GB MDF 20 22 12 KE Chain MDF 20 15 17 KE Chain Roll Up Door Operator MDF Rev 0 0 21...
Страница 23: ...GB MDF 30 42 12 KU Crank MDF 30 42 12 KE Chain Roll Up Door Operator MDF Rev 0 0 23...
Страница 25: ...GB MDF 30 27 12 KU 100 Crank MDF 30 30 12 KU Crank Roll Up Door Operator MDF Rev 0 0 25...
Страница 26: ...9 Technical data MDF 30 30 12 KE Chain MDF 30 50 12 KU Crank 26 Roll Up Door Operator MDF Rev 0 0...
Страница 27: ...GB MDF 30 50 12 KE Chain MDF 50 65 10 KU Crank Roll Up Door Operator MDF Rev 0 0 27...
Страница 28: ...9 Technical data MDF 50 65 10 KE Chain MDF 50 75 10 KU Crank 28 Roll Up Door Operator MDF Rev 0 0...
Страница 29: ...GB MDF 50 75 10 KE Chain MDF 6 100 9 KU Crank Roll Up Door Operator MDF Rev 0 0 29...
Страница 30: ...9 Technical data MDF 6 100 9 KE Chain MDF 6 100 9 KU 100 Crank 30 Roll Up Door Operator MDF Rev 0 0...
Страница 32: ......