After completion of the installation work, the device function must be checked. Before the inspection, it must
be ensured that the air ducts of the ventilation unit are free of installation residues / foreign bodies and that all
electrical work has been carried out and completed professionally!
After switching on the power supply (usually via the circuit breaker of
the electrical installation) the
AIRUNIT GEMINI
can be put into opera-
tion via the control panel of the
AIRUNIT control unit
. When starting
up, check
all
functions described in the
operating instructions of the
control
unit. During the check, ensure that the ventilator motor runs
smoothly and evenly.
Any malfunctions or faults detected in the
AIRUNIT ventilators
must be rectifi ed before the unit is fi nally put
into operation; possible causes of faults and their remedies are described in the chapter on
malfunctions (see
operating instructions for control).
Document the correctly executed installation / functional test of the ventilation unit(s) in the commissioning
protocol.
8.1 Function check