11
•
Assembly:
The assembly procedure is the reverse of disassembly. With the grinder head mounted,
fit it into the bearing according to the instructions below:
All parts must be fixed perfectly so that there is no jamming or wear, and so that the safety of
the operator is guaranteed. If any part has not been fitted correctly, repeat the operation and without
success, contact technical assistance.
•
Operation
: Before turning on the equipment, make sure that the supply voltage of the
equipment is in accordance with that of the electrical network. Also check that the funnel is fitted to
the head and filled with grains.
After checking these items, follow the equipment operation processes below:
• Connect the power cord to the electrical network;
• Place a container to store the ground grains below the outlet head;
• With the funnel already filled with the roasted grains, activate the on/off switch in position
“0” (off) and then “1” (on);
ATTENTION!
Always fill the funnel with roasted and low-moisture grains so that they do not adhere to the
grinding disc, causing poor performance and engine stalling.
• Leave the equipment on for a few seconds to check the grain granulation;
• Adjust the grinding setting using the handle for granulation adjustment (adjustment instructions in
item 4.2).
Type of the Granulation
Turkish
Express
Italian
Filtered
Pressed
Granulation
Very Fine
Fine
Medium
Medium to Coarse
Coarse
Содержание BIMG MCG8110M604
Страница 1: ...1 ...
Страница 16: ...16 6 ANEXXES Electrical Schematic Single phase Voltage 110 V or 220 V ...
Страница 17: ...17 Exploded View Drawing ...
Страница 18: ...18 Exploded View Drawing ...