21
4.6. Leak test
After installation it is necessary to check that the entire water installation is tight.
This is accomplished by performing a water leak test.
4.7. Commissioning of the domestic water circuit
Fill the water tank via the cold water connecting branch.
Disconnect the front panel
and deaerate the water tank by opening one of the hot water taps located at the high-
est level until air no longer appears at the tapping point.
A few days after the initial setup and start-up, check the installation for leaks in
the water installation.
IMPORTANT!
Before commisioning the water circuit
please read chapter 6 “Optimal Operation”.
Содержание Microbooster P
Страница 2: ...2...
Страница 48: ...48 12 DECLARATION OF CONFORMITY The Declaration of Conformity can be downloaded at www METROTHERM dk...
Страница 50: ...50 NOTES...
Страница 51: ...51...
Страница 52: ...METRO THERM A S RUNDINSVEJ 55 3200 HELSINGE INFO METROTHERM DK WWW METROTHERM DK 08 220 1809...