
16
3.1. Set-up sequence
Once the unit is placed in a room with characteristics as specified in the previous
paragraph, then it can be prepared following the sequence described below:
1. Remove the packaging from the pallet.
2. Remove the transport fittings from the pallet.
3. Remove the unit off the pallet and place it on the floor.
4. Adjust the unit vertically by adjusting the feet.
5. Check that the unit has no damages.
6. Set up the water circuit (See chapter 4) and fill the tank with water.
7. Set up the electric connections (See chapter 6).
When the unit is supplied with electricity, it automatically starts running in its
standard operation according to the factory settings as described in Chapter 7.
Figure 8 - Set-up sequence
Содержание Microbooster P
Страница 2: ...2...
Страница 48: ...48 12 DECLARATION OF CONFORMITY The Declaration of Conformity can be downloaded at www METROTHERM dk...
Страница 50: ...50 NOTES...
Страница 51: ...51...
Страница 52: ...METRO THERM A S RUNDINSVEJ 55 3200 HELSINGE INFO METROTHERM DK WWW METROTHERM DK 08 220 1809...