2.11.2005
Rev. 1.5
Installation
39
Installing the following kettle section
If a kettle group is being installed, proceed as follows:
Before installing the next kettle section, remove the bearing cover plate of the kettle al-
ready installed. After this, install the bearing unit and the axle lead-through cover plate,
supplied with the kettle delivery, exactly in the same way as it was installed on the support
pillar.
The installation of the next kettle section on the control pillar of the previous kettle takes
place in the same way as the installation of the first kettle on the support pillar.
5.3
Electrical connections
The electrical connections of the Proveno combi-kettle can only be carried out by a qual-
ified electrician having the necessary competence for the installation and service of elec-
trical appliances.
The support pillar cover plate, including the water tap, is a fixed component, not intended
for detaching. Do not force it upwards when removing the upper side plate.
To make the electrical connections, the upper left-hand side plate, where the mains switch
is located, must be removed and the cover of the electrical box underneath must be
opened.
1.
Front plate
2.
Mains switch
3.
Upper rear plate
4.
Upper side plate
5.
Screw
Turn the mains switch (2) to the OFF position.
Содержание PROVENO S 100
Страница 2: ......
Страница 4: ...2 11 2005 Rev 1 5...
Страница 7: ...2 11 2005 Rev...
Страница 8: ...2 11 2005 Rev...
Страница 62: ...Connection diagram S00123 B3...
Страница 63: ...Installation drawing L00115 B3...
Страница 64: ...Text part ChillPlus L00114 A4...
Страница 65: ...Steam supply recommendations 000030 A4...
Страница 68: ......