background image

B

A

E

ENG

LIS

H

OPERATIONAL SAFETY  

AND ASSEMBLY 

INSTRUCTIONS

READ THESE INSTRUCTIONS CAREFULLY 

BEFORE USING THIS PRODUCT. KEEP THIS 

MANUAL HANDY FOR FUTURE REFERENCE.

Pictures may differ from actual product

PUMP JACK 

SYSTEM

1

YEAR  

WARRANTY

OSHA

MEETS 1926.451 

& 1926.452(J)

ANSI

MEETS 10.8-2019

Be sure stirrup 

(A)

 is in the “Up” 

position. Unlock Crank 

(B)

 by sliding 

handle to the right or left until it turns 

freely. (If crank seems jammed, depress 

stirrup about 3” and return to “Up” 

position. This will free crank for easy 

unlocking.) Place left foot on the square 

key 

(C)

 of lower lock. Press foot down 

and hold lock open. Turn Crank

 (B)

 in 

a clockwise direction to lower staging 

approximately 1 foot and lock crank. 

Repeat this procedure on the other 

Pump Jack.

An extra Pole Brace is to be installed 

approximately 4 feet above the Pole 

Brace to be passed. Remove nails 

from clamp of Pump Pole Brace.  

Remove the wing nut and carriage 

bolt. Separate plates and let the 

brace swing down against the work 

wall. Do not remove Pump Jack 

Brace from wall. After the Pole Brace 

has been passed, reconnect it to 

the Pole and remove the extra Pole 

Brace.

Stand on walk plank with the jack and pole in front of you.  Lock the 

crank

 (A)

 by sliding the crank handle to the right or left until square 

rod is in square hole. Place right foot in stirrup

 (B) 

and pump slowly 

until platform is raised approximately 1 foot. Repeat this procedure on 

the other pump jack.

IMPORTANT

 – Raise Stirrup to “Up” Position 

(C)

 when desired 

height is reached.

TO RAISE PUMP JACK

TO LOWER PUMP JACK

TO PASS A PUMP POLE BRACE

A

C

B

TO OPERATE

Attach the pump jack to the pole with the bed facing 

the work wall, by removing pin and roller

 (D) 

crank

 

(E)

 square rod

 (F)

. Place the pump jack over the 

pole and reconnect parts. 

Open pump jack bed to full extended length and place 

planks on bed, thus completing staging.  Be sure that the 

platform is fully decked and the planking secured against 

movement. Install guard rails in accordance with OSHA 

regulations. The Guard Rail Holder should be used to assist 

in this installation.

D

SET UP

3

E

F

Отзывы: