![Metal Sistem SUPER 1-2-3 SHELVING Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/metal-sistem/super-1-2-3-shelving/super-1-2-3-shelving_instructions-for-the-correct-assembly_1776986004.webp)
6.
4.
5.
SUPER 1-2-3 - Assembly instructions
4
cod:
ISTM027
classification : CONTROLLED
Start the assembly procedure
from the lower diagonal.
Knock the top of the diagonal,
with a plastic capped hammer,
until the bottom connection
sits on the start of the opposite
upright lug.
Press the horizontal spacer bar
against the uprights and hammer
in position until the component
is seated and the safety clips are
activated.
If the horizontal spacer bar is
difficult to seat, twist the upright
until the spacer clips hard up
against the top of the connection
lugs and then hammer home
with the plastic capped hammer.
Tap the bottom connection so
that it seats.
Knock the top and then
the bottom of the diagonal
alternately until the component
is seated and the safety clips are
activated.
Содержание SUPER 1-2-3 SHELVING
Страница 11: ......