Metal Sistem SUPER 1-2-3 SHELVING Скачать руководство пользователя страница 3

A

A

A

A

X

X

< X

< X

1. 

3. 

2. 

3

SUPER 1-2-3 - Assembly instructions

cod: 

ISTM027

classification : CONTROLLED

Note the difference between the 
top and bottom connection of 
the diagonal.

The top is longer so to act as an 

assembly guide to set the correct 
assembly angle.

The dimension of the horizontal 

spacer bar is equal to the nominal 
frame dimension. Check the 
diagonal spacer bar by overlaying 
it against the horizontal. 
If the connection lugs align, 
the diagonal is correct.

Both diagonal and horizontal 
spacer bars contain a central 
ribbon (A), present between 
the connection lugs. This locks 
behind the upright connection 
lug to create a safety clip to 
prevent these components 
from decoupling.

Mark out the frame bracing 
connection points on the pair of 
uprights of a frame.
During this operation make 
sure to mark the correct side 
of the upright for each frame 
component, as detailed in the 

Technical Manual.

Assemble a complete frame 

following the procedure detailed 
below. Use the first frame as a 

guide for all other frame assembly.

Содержание SUPER 1-2-3 SHELVING

Страница 1: ...o TN tel 39 0464 303030 fax 39 0464 303031 www metalsistem com info metalsistem com Instructions for the correct assembly of the SUPER 1 2 3 SHELVING cod ISTM027 04 2019 1 Controlled Assembly instruct...

Страница 2: ...bracing components For each available frame height the manual provides number of horizontal bracing number of diagonals location in height of each component position referred to frame axis of each co...

Страница 3: ...f the connection lugs align the diagonal is correct Both diagonal and horizontal spacer bars contain a central ribbon A present between the connection lugs This locks behind the upright connection lug...

Страница 4: ...tal spacer bar against the uprights and hammer in position until the component is seated and the safety clips are activated If the horizontal spacer bar is difficult to seat twist the upright until th...

Страница 5: ...Assembly instructions cod ISTM027 classification CONTROLLED Rotate the frame Assemble the first face of the frame following MT 08 Assemble the second face of the frame following MT 08 and repeat the p...

Страница 6: ...shown then knocking it in the final position with the plastic tipped hammer Assemble the beams to the frames starting from the rear of the bay Approach the frames at an angle and press in position as...

Страница 7: ...ONTROLLED Complete assembly with plastic capped hammer Use the back of the palm to press the beam in position Repeat at the opposite upright The upright may be rotated to assist Beam correctly assembl...

Страница 8: ...ly of the rear beams before assembling the front beams Bend the upper end of the ribbon onto the beam Three safety pin models may be used First safety pin not suited for the central beams of double si...

Страница 9: ...ing it in position as shown Compact safety pin suited for both single and double side installations Position by hand the safety pin on top of the beam at the inside face of the upright PVC safety clip...

Страница 10: ...19 20 SUPER 1 2 3 Assembly instructions 10 cod ISTM027 classification CONTROLLED Place the shelving panels in position Assembly complete...

Страница 11: ......

Страница 12: ...METALSISTEM S p A Viale dell Industria 2 38068 Rovereto TN Italy tel 39 0464 303030 fax 39 0464 303031 info metalsistem com www metalsistem com...

Отзывы: