![Metal Sistem SUPER 1-2-3 SHELVING Скачать руководство пользователя страница 2](http://html1.mh-extra.com/html/metal-sistem/super-1-2-3-shelving/super-1-2-3-shelving_instructions-for-the-correct-assembly_1776986002.webp)
1
(132)
2
(264)
4
(528)
H mm
3
(396)
528
4
132
1
132
1
528
4
528
4
264
2
528
4
mm
mm
264
396
396
264
264
528
528
2
3
3
2
2
4
4
SUPER 1-2-3 - Assembly instructions
2
cod:
ISTM027
classification : CONTROLLED
Super 1-2-3 pitch position
SUPER 1-2-3 H3000mm frame
PREAMBLE
Refer to the Super 1-2-3 Technical Manual (MT08) for the cor-
rect location of the frame bracing components.
For each available frame height the manual provides:
·
number of horizontal bracing;
·
number of diagonals;
·
location in height of each component;
·
position referred to frame axis of each component (inner
or outer frame).
Images below detail the pitch of upright connection lugs and
the correct connection point onto the upright for each brac-
ing component.
The example shows a 3000mm high frame, for other dimen-
sions refer to the Technical Manual (MT08).
number
of pitches
connection lugs pitch
number
of pitches
inner frame
outer frame
Содержание SUPER 1-2-3 SHELVING
Страница 11: ......