METAL-FACH
Heating Technology
18
Assembly of the boiler
(User | Installer)
An important part of installation is the correct positioning and levelling of the SE MAX II type boiler, these boilers
do not require special foundations. The boiler must stand vertically.
1.
Check that four feet are included.
2.
Use a spirit level to level the boiler to the ground. If the boiler is in a horizontal position, the installation
of feet is not required.
3.
Screw the four feet into the designated holes.
4.
Use a spirit level to align the boiler
Installation of the boiler levelling feet
1.
Adjustment foot, pcs. 4
2.
Nut M10, pcs. 8
3.
Washer Ø10, pcs. 8
NOTE!
An improperly levelled boiler can be damaged.
NOTE!
The return water temperature from the system to the central heating boiler should not be
below 45ºC.
Содержание SE MAX II
Страница 1: ...Technical and operating documentation SE MAX II Original instructions edition 01 2022 English language...
Страница 2: ......
Страница 34: ...METAL FACH Heating Technology 32...
Страница 40: ...METAL FACH Heating Technology 38...
Страница 42: ...METAL FACH Heating Technology 40...
Страница 44: ...METAL FACH Heating Technology 42...
Страница 51: ......