8
8
PART 4
INSTALLATIONS AND OPERATION
OPERATION PROCEDURE
1.
Measure the OD of the pipe, and choose the proper clamp pad install on the machine. The working range
marked on the clamp pad, it is easy choose.
Caution:
The clamp pad size must same as pipe size, otherwise the beveling will be eccentric
2.
Put the pipe end into the machine, rotate the clamping handle clockwise, and make the machine
mounted on the pipe firmly.
Caution
: When beveling the thin wall pipe, use proper force clamping the pipe, avoid pipe out of shape.
3.
Install the proper tool bit on the cutter. Make sure the tool bit in
clockwise
. The machine performs cold
facing or beveling
Caution:
Keep tool tip about 2mm distance away from pipe OD surface. According to the pipe size,
positioning the tool bits.
4.
Turn on the motor, press down the tool feed wheel, the machine start working
Caution:
Cap and tool feed/back wheel rotate anticlockwise means feeding the tool.
4.1
Continuously spray coolant while working, make the iron scrap come out smoothly and prolong the
tool life.
4.2
If the tool becomes blunt, edge it or replace with a new one
4.3
While working, avoid iron scrap and coolant goes into motor.
5.
After job completed, pull up the tool back wheel, then turn off the motor. Clean the iron scrap; make
sure the scrap will not go into machine.
Caution:
When heard “kaka”, means the tool back finished, turn off the motor immediately, avoid the clutch
wear out.
6.
Rotate the clamping handle anticlockwise, take off the machine. Clean and dry it, then storage.
Caution:
When move the machine, lift the handle. Make sure do not lift the cable or tool feed/back wheel
When lubricate the machine, open the connection couple, grease it.