![Mestek TUBULAR GAS FIRED DIRECT SPARK PROPELLER UNIT HEATERS Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/mestek/tubular-gas-fired-direct-spark-propeller-unit-heaters/tubular-gas-fired-direct-spark-propeller-unit-heaters_installation-instructions-and-parts-identification_1775689009.webp)
9
INSTALLATION (continued) - PIPE INSTALLATION
Figure 4 - Pipe Installation, Standard Controls
Never use an open fl ame to detect
gas leaks. Explosive conditions may exist which
may result in personal injury or death!
The appliance and its individual shutoff valve must be
disconnected from the gas supply piping system during
any pressure testing of that system in excess of 1/2 psig
(3.5 kPa).
The appliance must be isolated from the gas supply
piping system by closing its individual manual shutoff
valve during any pressure testing of the gas supply
piping system at test pressures equal to or less than
1/2 psig (3.5 kPa).
Table 4 - Gas Piping Requirements
SINGLE STAGE GAS PIPING REQUIREMENTS*
GasType
Natural Gas
Propane (LP) Gas
Manifold
3.5 inch WC
10.0 inch WC
Pressure
(0.9 kPa)
(2.5 kPa)
14.0 inch WC Max.
14.0 inch WC Max.
Supply Inlet
(3.5 kPa)
(3.5 kPa)
Pressure
5.0 inch WC Min.
11.0 inch WC Min.
(1.2 kPa)
(2.7 kPa)
*For single stage application only at normal altitudes.
1. Install the gas piping in accordance with applicable
local codes.
2. Check gas supply pressure. Each unit heater must
be connected to a manifold pressure and a gas
supply capable of supplying its full rated capacity as
specifi ed in Table 4. A fi eld LP tank regulator must be
used to limit the supply pressure to a maximum of 14
inches W.C. (3.5 kPa). All piping should be sized in
accordance with the latest edition of ANSI Standard
Z223.1 (NFPA 54), National Fuel Gas Code; in
Canada, according to CSA B149. See Tables 1 & 3
for correct gas piping size. If gas pressure is
excessive on natural gas applications, install a
pressure regulating valve in the line upstream from
the main shutoff valve.
3. Adequately support the piping to prevent strain on
the gas manifold and controls.
4. To prevent the mixing of moisture with gas, run the
take-off piping from the top, or side, of the main.
5. Standard Unit Heaters, optional two-stage units are
supplied with a combination valve which includes:
a. Manual "A" valve
b. Manual "B" valve
c. Solenoid valve
d. Pressure regulator
Pipe directly into the combination valve (see Figure
4).
6. Gas valve has a pressure test post requiring a
3/32 inch hex head wrench to read gas supply and
manifold pressures. Open 1/4 turn counterclockwise
to read, turn clockwise to close and reseat. A 5/16
inch ID hose fi ts the pressure post.
7. Provide a drip leg in the gas piping near the gas
unit heater. A ground joint union and a manual gas
shutoff valve should be installed ahead of the unit
heater controls to permit servicing. The manual
shutoff valve must be located external to the jacket
(See Figure 4).
8. Make cer tain that all connections have been
adequately doped and tightened.
Do not over tighten the inlet gas
piping into the valve. This may cause stresses that
will crack the valve!
NOTICE: Use pipe joint sealant resistant to the
action of liquefied petroleum gases regardless of
gas conducted.
Check all pipe joints for leakage
using a soap solution or other approved method.
Never use an open flame or severe personal
injury or death may occur!
D3631C
Содержание TUBULAR GAS FIRED DIRECT SPARK PROPELLER UNIT HEATERS
Страница 11: ...11 ELECTRICAL CONNECTIONS continued Figure 5d Tubular Units Equipped with Natural Gas and Propane LP Gas...
Страница 12: ...12 ELECTRICAL CONNECTIONS continued Figure 5e Tubular Unit Sizes with Optional 2 Stage Ignition...
Страница 16: ...16 Figure 8A Figure 8B VENTING continued D3620F D3619C...
Страница 17: ...17 VENTING continued Figure 9A Figure 9B D3661F D3662D...
Страница 29: ...29 NOTES...
Страница 30: ...30 NOTES...