MESA LABORATORIES DataTrace MPIII Скачать руководство пользователя страница 22

MESA LABORATORIES, INC. DataTrace Division 

 Standard 

Operating 

Procedure 

 

Release Date: August 27, 2010 

Page: 22 of 32 

Revision B 

 

 

Dow 200 silicone fluid with a viscosity of 20 centistokes is recommended as the 
medium in constant temperature baths for temperatures from 80°C to 150°C. 
Silicone fluid should not be heated above 150°C for testing Tracers. 

 

B.  The standard used should be accurate to 0.025°C or better and traceable to N.I.S.T.  

 

The constant temperature baths should be installed, operated and maintained in 
accordance with the bath manufacturer's instructions and with the Material Safety 
Data Sheets (MSDS) s of the manufacturer of the silicone fluid. 

 

The bathes shall be installed, operated and maintained in accordance with the 
manufacturer's instructions. 

 

 

Set up the bath or baths and allow them to stabilize at target temperature for 15 
to 30 minutes. 
 

 

Program the Tracers to be tested for 30 second intervals, starting approximately 
15 minutes before they will be immersed into the baths or positioned in the oven. 
 

 

Synchronize your computer clock with your time standard or wrist watch. 
 

 

For LoTemp, Standard Temp, and MPIII Tracers to be tested in baths: 

 

C.  When placing Tracers into the bath, position their probe tips in such a way that when 

they are submerged the tips will be at least 1” away from the bottom or sides of the 
bath, and will be submerged at least 1½” below the fluid level. Tie wraps can be used 
to help position the probe tips of flex Tracers probes. 

 

Some custom length rigid probes do not fit into the baths. A bath lid should be used 
that has holes appropriate for inserting the probes into the bath through the lid. 
 

D.  Cover the bath with the lid and insert the reference into the hole in the lid. Slide it in 

to a level that places its tip near the middle of the bath. For best results try to position 
the reference probe and the Tracer probes as close to each other as possible without 
touching. Observe the minimum immersion depth for the reference probe. 

 

E.  After the Tracers have been immersed for 15 minutes and the temperature indicated 

on the display of the reference probe has stabilized, record the indicated temperature 
and time. 

 

F.  Repeat steps 1 through 3 for each additional temperature point. 

 

G.  Read Tracer and compare Tracer data to the time and reading from the reference 

probe. 

 

H.  For High Temp Tracers to be tested in an isothermal block: 

 

CAUTION: TEMPERATURES OVER 140°C WILL DAMAGE THE MPIII TRACER’S 
ELECTRONICS AND BATTERY. TEMPERATURES OVER 150°C WILL DAMAGE 
THE FRB TRACER’S ELECTRONICS AND BATTERY. USE A FACTORY 
RECOMMENDED THERMAL PACK TO PROTECT THE TRACER’S 
ELECTRONICS AND BATTERY. 

Содержание DataTrace MPIII

Страница 1: ...ame _____________________________________ Date ______________ Title ____________________________________________________________ Technical Services Name _____________________________________ Date ____...

Страница 2: ...lishing Security Levels 8 Procedures 8 1 System Connection 8 2 Installing DataTrace for Windows Software 8 3 Operating the DTW Program 8 4 Programming Tracers for Study 8 5 Reading Collected Data 8 6...

Страница 3: ...he seal for all Tracers replace and properly lubricate the new O ring whenever the Tracer is opened Ensure that the Tracer cover is properly secured before using Tracers should be kept in their Storag...

Страница 4: ...85 C Note the warning labels on the batteries or battery trays The battery should be replaced by a qualified technician in an anti static and non hazardous environment Disposal of spent batteries mus...

Страница 5: ...2 degrees Fahrenheit relative humidity should stay between 0 to 99 percent non condensing 6 2 PC Interface System MPIII Interface Module 1 The MPIII Interface receives its operating power through the...

Страница 6: ...recording data profiles The greatest risk to a Tracer is being dropped onto a hard surface The sensing probe or the electronics could be damaged by the impact 6 4 Battery Replacement Procedures MPIII...

Страница 7: ...ls out 5 Dispose of the battery appropriately per local regulations DO NOT TRY TO RECHARGE DISASSEMBLE OR INCINERATE THE BATTERY 6 Examine the battery compartment for any signs of contamination and ma...

Страница 8: ...clockwise until resistance is felt It is important not to over tighten the battery cover so a coin or other low torque device should be used in the cover s groove to complete the tightening procedure...

Страница 9: ...body completely Make sure no process residue remains on the Tracer body that could cause the Tracer to slip from your grasp during disassembly or could contaminate the battery compartment during batt...

Страница 10: ...n the Tracer battery compartment has been opened The Tracer is now ready to reassemble with a new battery We strongly recommended that Tracers are NOT left unassembled Damage to components could occur...

Страница 11: ...r to installation in the Tracer The best place for this activity would be close to the location that Tracers are stored and programmed Tracer batteries are replaced and Tracers are assembled and disas...

Страница 12: ...led with security capabilities that include password protection and data encryption When enabled access to various program functions can be strictly controlled In addition the program can enable Elect...

Страница 13: ...f the DTW program 2 The first time DTW is started following installation with an enhanced security level designated the Login screen appears 3 Enter admin as the Login and admin as the Password This i...

Страница 14: ...monly referred to as Electronic Signatures The following functions occur only in Complete security mode 8 Data Signing in DataTrace for Windows requires Tracer reads to be digitally signed by the user...

Страница 15: ...DataTrace for Windows Software DataTrace for Windows includes an automatic installation program that will start the installation when the CD is inserted into the CD ROM drive The DTW installation pro...

Страница 16: ...installation is complete 8 3 Operating the DTW program The computer is the input device to program and retrieve data from the target process via the DataTrace System The DataTrace System software and...

Страница 17: ...another value should be entered in the Run ID up to a maximum of eight characters enter it in the text box Press Enter The Auto Number can be defined by clicking the Auto Number button 2 Change eithe...

Страница 18: ...tab A summary table for the Tracer appears along with the program used to collect the data Below the summary table information is a Comments text box where up to 80 characters of notes can be entered...

Страница 19: ...r screen appears the data report will be printed The printout includes all of the Tracer data displayed on the screen along with the complete data set plus some additional information At the top of th...

Страница 20: ...8 Editing of each of the graph elements is accessible by a right click on the target element An edit menu will appear with various options depending on the nature of the target element Modify anythin...

Страница 21: ...ecommend that temperature points are selected which are critical in reference to the target process For example using Tracers in a sterilization process would suggest using 121 C for a verification po...

Страница 22: ...robe tips in such a way that when they are submerged the tips will be at least 1 away from the bottom or sides of the bath and will be submerged at least 1 below the fluid level Tie wraps can be used...

Страница 23: ...oven or dry well calibrator off CAUTION BE SURE TO WEAR WELDERS GLOVES WITH GAUNTLETS WHEN HANDLING HOT OBJECTS FROM THE OVEN Q After the Tracers have cooled enough to handle comfortably remove them...

Страница 24: ...layed by the Humidity Tracer with the target humidity value from the chamber or the salt solution J If the humidity value indicated by the Humidity Tracer is outside of an acceptable range either retu...

Страница 25: ...rforming field calibrations on DataTrace equipment There are two types of calibrations that are possible The first is for temperature in the Micropack III version temperature only Tracers and the seco...

Страница 26: ...temperature Tracer in either a One Point or a Two Point Calibration cycle The calibration process starts when the Program button is pressed However the calibration screens will not appear until the T...

Страница 27: ...ons displayed 6 On the first screen select the parameter to calibrate and whether a Single Point or a Two Point calibration is needed 7 Select the Tracer Reading what the Tracer is actually reading fr...

Страница 28: ...accuracy the application requires One and Two Point Calibrations optimize the humidity sensor for use in a particular application while a New Sensor Calibration is a special calibration to optimize t...

Страница 29: ...ation is almost the same The primary difference is that for a two point calibration be prepared to expose the target Tracer to two humidity environments during the process and the Calibration Wizard w...

Страница 30: ...ion and will be stored in the Calibration History log 13 Items 10 11 and 12 are repeated for the second point if a Two Point Calibration was selected 14 On the next screen a summary of the one or two...

Страница 31: ...ow point and greater than 80 rH for the high point Ideal new sensor calibration values would be 30 rH and 90 rH Humidity reference values can be obtained from either salt solutions or a humidity gener...

Страница 32: ...Tracers 8 9 1 Viewing Audit Trail The DataTrace for Windows audit trail is accessible through the Report functions Click on the Audit Trail button and the audit trail screen is displayed indicating e...

Отзывы: