Install the AP300
© 2010 Meru Networks, Inc.
Installing AP300
31
Figure 11: AP300 Mounted Above a Suspended Ceiling Face Up
The AP300 with the metal enclosure exposed meets the requirements for fire resistance and low
smoke-generating characteristics required by Section 300-22(C) of the National Electrical Code (NEC)
for installation in a building’s environmental air space.
You may need to modify thicker tiles to support this installation.
Warning!
When installed in air-handling spaces, such as above a suspended ceiling,
power the AP300 only with a PoE, not a power supply. See
for part
numbers.
Warning!
Any Fast Ethernet (FE) cables installed in air-handling spaces should be
suitable under NEC Article 800.50 and marked accordingly for use in plenums and air-
handling spaces with regard to smoke propagation, such as CL2-P, CL3-P, MPP (Multi
Purpose Plenum), or CMP (Communications Plenum). Use Ethernet cable that meets
the requirements for operating in plenums and environmental air space in
accordance with Section 300-22(C) of the NEC.
00232
Содержание AP1000 SERIES
Страница 2: ......
Страница 10: ...x Meru Access Point Installation Guide 2010 Meru Networks Inc...
Страница 21: ...AP150 2010 Meru Networks Inc Access Points 7 PWR LAN RADIO 2 RADIO 1 00175...
Страница 23: ...OAP180 2010 Meru Networks Inc Access Points 9...
Страница 24: ...10 Meru Access Point Installation Guide 2010 Meru Networks Inc OAP180...
Страница 66: ...52 Meru Access Point Installation Guide 2010 Meru Networks Inc Where to Go From Here...
Страница 100: ...86 Meru Access Point Installation Guide 2010 Meru Networks Inc Where to Go From Here...
Страница 114: ...100 Meru Access Point Installation Guide 2010 Meru Networks Inc Where to Go From Here...
Страница 122: ...108 Meru Access Point Installation Guide 2010 Meru Networks Inc Warnings...
Страница 135: ...Meru Networks Inc 894 Ross Drive Sunnyvale CA 94087 408 215 5300 www merunetworks com...