
Pack B
36
36
24
20
24
29
4
Pre drill
hole
70mm
screw
Step 2a
Fix the mesh Panels
(No. 29)
into position
and secure with 4x50mm screws per
panel.
**Do NOT fix to the base framing until the
Roof is secured**
8x50mm screws.
Pre drill
hole
50mm
screw
Step 3a
Fix the mesh Panels
(No. 4)
into position
and secure with 4x50mm screws per
panel.
**Do NOT fix to the base framing until the
Roof is secured**
8x50mm screws.
Pre drill
hole
50mm
screw
Step 1a
Place the Base bearers
(No. 20, 24 & 36)
into position
and secure to each with
2x70mm screws.
**Do NOT fix to the base framing until the
Roof is secured**
8x70mm screws.
Please retain product label and instructions for future reference
P 9