background image

P 1

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All buildings should be 

erected by two adults

For ease of assembly, you 

MUST

 pilot drill all screw 

holes and ensure all screw 

heads are countersunk.

For assistance please contact customer care on: 01636 880514

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces of the 

timber.  You are strongly advised to wear gloves 

when working with or handling rough sawn 

timber.

Please retain product label and instructions for future reference

             

General Instructions

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) 

including  a Phillips screwdriver, Stanley knife, Wood saw, Step ladder, Hammer and a 

Drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather conditions. 

For the duration of heavy or extended periods of rain, swelling of the wood panels may 

occur. Warping of the wood may also occur during excessive dry spells due to an interior 

moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is 

suggested that the outdoor building is sprayed with water during extended periods of 

warm sunshine and sheltered as much as possible during rain or snow. 

Our buildings are pre treated with a water based treatment**; this only helps to protect 

the product during transit and for up to 3 months against mould.  To validate your 

guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated 

with a wood preserver within the first three months of assembly and thereafter in 

accordance with the manufactures recommendations.  Care must be taken to ensure 

the product is placed on a suitable base.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to 

diagrams for the base dimensions,  The base should be slightly smaller than the external 

measurement of the building, i.e. The cladding should overlap the base, creating a run 

off for water. It is also recommended that the floor be at least 25mm above the 

surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Whilst all products manufactured  are made to the highest standards of Safety and in 

the case of childrens products independently tested to EN71 level, we cannot accept 

responsibility for your safety whilst erecting or using this product.

Refer to the instructions pages for you specific product code

For ease of assembly, you 

will need a tape measure to 

check dimensions of 

components.

Pressure Treated Timber

Pressure treating is a chemical process which helps to protect wood against adverse weather which could 

lead to rot or insect damage.

The most common chemicals used to pressure treat wood are 

Alkaline Copper Quaternary

 (

ACQ

), 

Copper Azole

 (

CA

), and 

Micronized Copper Quaternary

 (

MCQ

).

Safety: 

Always wear gloves, eye protection and a dust mask when handling wood. Due to chemicals in 

pressure treated wood, never burn its sawdust or scraps; instead dispose in a landfill.

It is advisable to use a hand 

saw when cutting roof and 

floor boards.

10PTDRK0806-V1

Staffordshire

Содержание Staffordshire 10PTDRK0806-V1

Страница 1: ...inst mould To validate your guarantee and ensure longevity of the product it is ESSENTIAL the building is treated with a wood preserver within the first three months of assembly and thereafter in acco...

Страница 2: ...I 10DRKDA542x965 Door B QTY 1 AI 10DRKDB542x695 Fascias 12x60x1100mm S1260 1100mm x4 17 9 10 11 12 13 14 15 16 1 5 6 7 8 2 3 4 Ridge Bar 27x70x1153mm F2770 1153mm x1 18 Bearer 27x44x1119mm F2744 1119m...

Страница 3: ...upport 27x44x987mm F2744 G 987mm x2 33 Block 27x44x140mm F2744 G 140mm x2 34 Truss Support 27x44x450mm F2744 G 450mm x1 35 Image of 0806 extension Please retain product label and instructions for futu...

Страница 4: ...g and fix together with 4x50mm screws Do NOT fix to the base framing until the Roof is secured 4x50mm screws Step 3 Place the second side panel No 2 onto the the base framing and fix together to the b...

Страница 5: ...Roof is secured 8x50mm screws Pre drill hole 50mm screw Step 7 Fix the mesh Panels No 6 into position and secure with 4x50mm screws per panel making sure you screw from the inside Do NOT fix to the b...

Страница 6: ...the longest side of the Roof OSB No 10 with 3x30mm screws per Eaves frame Ensure you fix the eaves frame to the roof before you place the roof on the building Do NOT fix to the base framing until the...

Страница 7: ...4x30mm Black screws 11 14 7 8 23 14 Pre drill hole 30mm screw Step 15 Fix the cover trims No 23 to the corners of the building with 4x30mm screws 16x30mm Screws Note Hinges to go on the side with the...

Страница 8: ...crews Fix the pad bolt No 15 with 6x30mm screws on the horizontal brace on the door Then fix the pad bolt retainer to the door pannel framing using 4x30mm screws 10x30mm screws If you have purchased f...

Страница 9: ...mm screw Step 3a Fix the mesh Panels No 4 into position and secure with 4x50mm screws per panel Do NOT fix to the base framing until the Roof is secured 8x50mm screws Pre drill hole 50mm screw Step 1a...

Страница 10: ...Roof is secured 23x40mm screws 6x50mm screws Pre drill hole 40mm screw 50mm screw Step 7a Measure 17mm from the top of the mesh panel and mark with a pencil Align the top of the block with the pencil...

Страница 11: ...screws evenly spaced inside the dog kennel area screwing through the panel framing Use 70mm screws to secure the mesh pannels to the base frame 4 screws per panel 16x50mm screws 16x70mm screws Pre dr...

Страница 12: ...structions for future reference P 12 Pre drill hole 40mm screw 30mm screw Step 15a Attach the fascias to the front and rear No 17 of the building with 4x40mm screws per fascia Once in place cut of the...

Страница 13: ...o 11 onto the door No 5 and door frame as shown in the previous diagram 21x30mm Black Screws Fit the turn buttons No 14 to the building using 1x30mm black screws as shown in the previous diagram 2x30m...

Отзывы: