background image

P 9

Step 5

Fix two eaves frames to each roof sheet 
using 3x30mm screws per eave.

Fix the roof sheets to the roof ensuring 
they come together at the top using 
40mm screws directly through the roof 
sheet at the top. Make sure to attach the 
roofs to the ridge bar. 

16

6

30mm 

screw

16

12x 30mm Screws
28x 40mm Screws

40mm 

screw

Pre drill 

hole

Pre drill 

hole

Step 6

b

Once the roof is fixed 
attach the building to 
the floor with 50 mm 
screws.

16x 50mm Screws

50mm 

screw

Pre drill 

hole

100x Tacks

Felt 

tacks 

21

22

22

21

Step 7

Cut the felt into 2 sheets at 2490mm and 
fix onto the roof using felt tacks as shown 
in diagram ensuring there is 50mm 
overhang around the sides. Cut the 
capping felt to 2490mm and fix over the 
centre of the apex as shown in the 
diagram ensuring there is 50mm over-
hang around the sides.

HANDLE

WITH CARE

1

2

3

4

Отзывы: