P 6
Please retain product label and instructions for future reference
Please retain product label and instructions for future reference
6
9
6
Step 7
Place the first roof panel (
No. 6
) onto
the supports (
making sure the roof
framing sits behind the support bar
)
and secure with 20x40mm screws as
shown in the diagram. Ensure the
screws line up with the roof support
bars.
20x40mm Screws
40mm
screw
Pre drill
hole
Fix the roof bar to the supports where
they meet (
internally
) using 8x40mm
screws.
8x40mm Screws
40mm
screw
Pre drill
hole
40mm
screw
Pre drill
hole
6
*Repeat this process with
the second roof panel.
28x40mm Screws
Step 8
Position the roof ends (No. 13) onto
the roof, ensuring the tongue and
groove align and the boards sit
flush together.
Secure each board to the gable
framing using 6x30mm screws.
12x30mm Screws
30mm
screw
Pre drill
hole
13
13
Step 9
Secure the building to the
floor using 36x50mm screws.
36x50mm Screws
*Ensure to align the screws with the
floor bearers.
50mm
screw
Pre drill
hole
b
b
b
b
b
b
b
b
b