P 6
Please retain product label and instructions for future reference
Step 8
(See Pre-Assembly)
Parts needed -
No. 6 QTY 6
No. 7 QTY6
No. 8 QTY 6
No. 9 QTY 6
No. 10 QTY 10
No. 11 QTY 6
No. 12 QTY 6
No. 26 QTY 1
Following the same method
outlined in
Pre-Assembly
, lay
the remaining Log Boards
(
No’s. 6, 7, 8, 9, 10, 11,12 & 26
)
onto the assembly to bring the
board level to the door frames.
*Ensure that the boards are
level and flush with each
other as you lay each one.
*Doors can be hung once the
boarding has enclosed the
door frame.
10
8
9
6
7
12
11
26
Step 7
Once you have laid the second
level of boards onto the assembly
slide the window(
s
)
(No. 1)
between the
smaller boards and rest on to the
longer board.
*Ensure the boards are level with
each end.
*Please note:
This image is for
illustrative purposes and may
differ from your choice in product
(
regarding window position
).
Nevertheless the process of fitting
the window is the same.
Step 9
(See Pre-Assembly)
Parts needed - No. 4.1C QTY 2
No. 4.2 C QTY 1
No. 8 QTY 2
No. 24 QTY 1
No. 25 QTY 1
Place the next Log
Boards (
No. 8 & 25
) onto the
rear and front of the building as
shown in the diagram.
4
.1c
4
.2c
8
4
.1c
8
25
24
Once in position, place the
first board of the gables (
No’s 4.1C
& 4.2C)
onto the assembly fixing
with 2x70mm screws.
Then add the last two Boards
(
No’s 8 & 24
) onto the front and
rear of the building as shown in
the diagram.
*Ensure that the boards are
level and flush with each
other as you lay each one.
a
b
a
b