P 8
Please retain product label and instructions for future reference
Step 13
Parts needed - No. 19 QTY 2
Ensuring the roof boards are
flush at the overhanging sides, fix
the Eaves Frames (
No. 19
) to the
underside of the roof boards
using 9x40mm screws as shown
in the
illustration.
*Please Note:
This image is for
illustrative purposes and may
differ from your choice in
product. Nevertheless the
process
of fixing the eaves frames is the
same.
18x40mm Screws
40mm
screw
Pre drill
hole
13
Step 12
Parts needed - No. 13 QTY 36
Place the first two roof board’s (
No.
13
) onto the assembly on each side,
making sure the boards are flush to
the end of the roof purlin. Once in
position fix to each purlin using
4x40mm screws.
Due to natural occurences of wood
shrinkage / expansion. You maybe
required to use the provided spac-
ers and place a space of 2mm to
ensure every roof board lines up
with the truss’.
Continue adding the roof boards
along the roof, fixing each one into
position using 4x40mm screws,
making sure that each board is
interlocked, flush at the bottom.
The last board on each side will
consist of a tongue and groove
overhang: Using a straight edge
and a pencil mark out a line as
a guide.
Cut along the pencil mark and
remove the excess. Place the cut
down board’s back onto the roof
and secure into place using
4x40mm screws per board.
*Please Note:
This image is for
illustrative purposes and may
differ from your choice in product.
Nevertheless the process of
cutting and fitting the last roof
board(s) is the same.
144x40mm Screws
40mm
screw
Pre drill
hole
*
Cut to fit
13
b
IMPORTANT:
Pre-drill before fixing screws.
IMPORTANT:
Pre-drill before fixing screws.
28
19