Mercia Garden Products 0628LOG125-V4 Скачать руководство пользователя страница 8

Please retain product label and instructions for future reference

13

Step 13

Parts needed - No. 18 QTY 4

Ensuring the roof boards are flush

at the overhanging side and meet

at the apex, fix the eaves frames 

(

No. 18

) to the underside of the roof

boards using 9x40mm screws.

*Please Note: 

This image is for 

illustrative purposes and may 

differ from your choice in 

product. Nevertheless the process 

of fixing the eaves frames is the

same.

36x40mm Screws 

40mm 

screw

Pre drill 

hole

Step 14

Parts needed - No. 13 QTY 34

Place the first floor board (

No. 13

)

inside the building flush to the log

board on one side. Continue adding

the floor boards (

internally

) making

sure to interlock each individual

board.

*Do 

NOT

 secure the boards until

the last board has been measured

and cut.

Measure the gap between the 

bottom of the tongue (

on the last 

board placed

) and the log board.

Using a straight edge mark out the 

measurement onto the last floor

board (

No. 13

) and cut along the 

length removing the excess.

**Please note:

 Mark the final board

2mm under the measurement; This

will allow the timber to expand and

contract correctly.

Once all the floor boards are in 

position secure each board into

position using 8x40mm screws.

***Please Note:

 

Ensure to screw 

through each of the floor boards 

into the floor bearers.

272x40mm Screws 

40mm 

screw

Pre drill 

hole

*

Cut to fit

P 8

28

18

Содержание 0628LOG125-V4

Страница 1: ...sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow BUILDING A BASE When thinking about where the building and base are going to be constr...

Страница 2: ...20x232mm QTY 24 LB28 B 232 Log Board 28x120x232mm QTY 24 LB28 C 232 Log Board 28x120x4400mm QTY 2 LB28 AE 4400 Log Board 28x120x4800mm QTY 2 LB28 AE 4800 Log Board 28x120x5200mm QTY 2 LB28 AE 5200 Roo...

Страница 3: ...rlocks at either end in a staggered pattern Before securing ensure that the boards are fitted properly in their respective tongues and grooves Nail Bag 40mm Screw x602 30mm Screw x66 P 3 Please retain...

Страница 4: ...t as shown in the illustration Fix the framing together at each corner using 8x70mm screws ensuring the frame is flush 8x70mm Screws Step 2 Parts needed No 14 QTY 11 Arrange the remaining framing No 1...

Страница 5: ...No 8 QTY 12 Following the same method outlined in Pre Assembly lay the next 6 boards No 5 7 8 onto the assembly to create your second level Ensure that the boards are level and flush with each other a...

Страница 6: ...sure that the boards are level and flush with each other as you lay each one 4x70mm Screws Pre drill hole 70mm screw Step 10 Parts needed No 3 QTY 2 Place the gable tops No 3 onto the assembly Fix int...

Страница 7: ...screws Due to natural occurences of wood shrinkage expansion You maybe required to use the provid ed spacers and place a space of 2mm to ensure every roof board lines up with the truss Ensure the roo...

Страница 8: ...he log board on one side Continue adding the floor boards internally making sure to interlock each individual board Do NOT secure the boards until the last board has been measured and cut Measure the...

Страница 9: ...the building place the closure trim No 20 against the boarding and align with the roof as shown in the illustration Once in position fix each trim into place by pre drilling a pilot hole and using 6x3...

Страница 10: ...he apex 12x40mm Screws Pre drill hole 40mm screw 17 17 17 17 P 10 Step 19 Parts needed No 19 QTY 2 Arrange the storm braces No 19 around the building internally Place 2x storm braces per side fixing i...

Отзывы: