Mercia Garden Products 0628LOG125-V4 Скачать руководство пользователя страница 10

It is ESSENTIAL that you apply wood 

treatment immediately after the building 

has been assembled.

Please retain product label and instructions for future reference

Step 18

Parts needed - No. 17 QTY 4

Align the fascia’s (

No. 17

)

with the roof and fix into

place using 3x40mm

screws per fascia, making

to screw through the 

fascia into the roof purlins

and eaves frame.

*Ensure the angled cuts meet

at the top of the apex.

12x40mm Screws

Pre drill 

hole

40mm 

screw

17

17

17

17

P 10

Step 19

Parts needed - No. 19 QTY 2

Arrange the storm braces (

No. 19

)

around the building (

internally

). 

Place 2x storm braces per side 

fixing into place using 2x70mm 

bolts per brace making sure the 

washer & nut are tightened from 

the outside of the building.

*Ensure the storm braces are

secured at the highest point

possible on each side.

**Storm braces will help your

building expand and contract

properly.

***It is important that each

bolt is tightened using a 

washer so as not to damage 

the log boards.

16x70mm Bolt Sets

Pre drill 

hole

70mm 

bolt

17

17

Содержание 0628LOG125-V4

Страница 1: ...sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow BUILDING A BASE When thinking about where the building and base are going to be constr...

Страница 2: ...20x232mm QTY 24 LB28 B 232 Log Board 28x120x232mm QTY 24 LB28 C 232 Log Board 28x120x4400mm QTY 2 LB28 AE 4400 Log Board 28x120x4800mm QTY 2 LB28 AE 4800 Log Board 28x120x5200mm QTY 2 LB28 AE 5200 Roo...

Страница 3: ...rlocks at either end in a staggered pattern Before securing ensure that the boards are fitted properly in their respective tongues and grooves Nail Bag 40mm Screw x602 30mm Screw x66 P 3 Please retain...

Страница 4: ...t as shown in the illustration Fix the framing together at each corner using 8x70mm screws ensuring the frame is flush 8x70mm Screws Step 2 Parts needed No 14 QTY 11 Arrange the remaining framing No 1...

Страница 5: ...No 8 QTY 12 Following the same method outlined in Pre Assembly lay the next 6 boards No 5 7 8 onto the assembly to create your second level Ensure that the boards are level and flush with each other a...

Страница 6: ...sure that the boards are level and flush with each other as you lay each one 4x70mm Screws Pre drill hole 70mm screw Step 10 Parts needed No 3 QTY 2 Place the gable tops No 3 onto the assembly Fix int...

Страница 7: ...screws Due to natural occurences of wood shrinkage expansion You maybe required to use the provid ed spacers and place a space of 2mm to ensure every roof board lines up with the truss Ensure the roo...

Страница 8: ...he log board on one side Continue adding the floor boards internally making sure to interlock each individual board Do NOT secure the boards until the last board has been measured and cut Measure the...

Страница 9: ...the building place the closure trim No 20 against the boarding and align with the roof as shown in the illustration Once in position fix each trim into place by pre drilling a pilot hole and using 6x3...

Страница 10: ...he apex 12x40mm Screws Pre drill hole 40mm screw 17 17 17 17 P 10 Step 19 Parts needed No 19 QTY 2 Arrange the storm braces No 19 around the building internally Place 2x storm braces per side fixing i...

Отзывы: