![Mercia Garden Products 0628LOG125-V4 Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/mercia-garden-products/0628log125-v4/0628log125-v4_general-instructions-manual_1772654006.webp)
P 6
Please retain product label and instructions for future reference
Step 8
Parts needed - No. 5 QTY 14
No. 7 QTY 12
No. 8 QTY 12
No. 9 QTY 2
No. 10 QTY 2
Lay the remaining boards
(
No. 5, 7, 8, 9 & 10
) onto the
assembly to bring the board
level to the top of the
window and door frames.
*Ensure that the boards are
level and flush with each
other as you lay each one.
*Doors can be hung once the
boarding has enclosed the
door frame.
Step 9
Parts needed - No. 5 QTY 1
No.11 QTY 2
No. 21 QTY 1
Lay the last two boards (
No. 5 &
21
)
onto the front of the
assembly. Once in position place
log board (
No. 11
) onto the
window and plain side, fixing
into position by screwing
through the notches as shown
in the illustration.
*Ensure that the boards are
level and flush with each
other as you lay each one.
4x70mm Screws
Pre drill
hole
70mm
screw
Step 10
Parts needed - No. 3 QTY 2
Place the gable tops
( No. 3)
onto the
assembly. Fix into position by
screwing through the notches
as shown in the illustration.
*Ensure that the boards are
level and flush with each
other as you lay each one.
4x70mm Screws
Pre drill
hole
70mm
screw
IMPORTANT:
Pre-drill before fixing screws.
IMPORTANT:
Pre-drill before fixing screws.
7
8
5
5
10
5
5
11
11
21
3
3
8
5
9
9
10
Step 7
Once you have laid the second
level of boards onto the assembly
slide the window(
s
)
(No. 1)
between the
smaller boards and rest on to the
longer board.
*Ensure the boards are level with
each end.
*Please note:
This image is for
illustrative purposes and may
differ from your choice in product
(
regarding window position
).
Nevertheless the process of fitting
the window is the same.