P 6
Please retain product label and instructions for future reference
Step 4
Parts Needed - No. 30 QTY 1
No. 31 QTY 1
Place the ‘L Frame’
(No.31)
and the
Strip
(No. 30)
flush together, creating
a ‘U’ shaped channel, as shown in the
illustration.
Fix together using 6x30mm screws.
6x30mm Screws
31
30
31
30
30mm
screw
Pre drill
hole
IMPORTANT:
Pre-drill before fixing screws.
15
14
13
Step 5
Parts Needed - No. 13 QTY 1
No. 14 QTY 1
No. 15 QTY 1
Place the starter boards
(No. 13 & 15)
on to the assembled base frame
along the front and the back, and
place the first log board
(No. 14)
in
the notches as shown.
Locate the ‘U’ Channel
(if you have not
yet constructed your ‘U’ channel please
refer to Step 4)
so it is flush to the side
of the log cabin’s log boards, and the
‘U’ channel sits around the starter
board
(No. 15)
.
**Please note: The starter board
(No.15)
should sit flush to the back of
the back bearer, and the back strip of
the ‘U’ channel should overhang this
bearer, as shown in the illustration.
**Ensure the measurement between
the ‘U’ channel and log cabins log
boards is equal at the top and
bottom of the ‘U’ channel.
13
15