P 9
Please retain product label and instructions for future reference
Step 10
Once you have laid 6 log boards (
off of the starter
)
up the door section, slide the assembled door
frame over the boards resting the frame on top of
the starter board
(if you have not yet assembled
the door frame refer to step 9)
*Please note:
This image is for illustrative purposes
and may differ from your choice in product
(
regarding door position
). Nevertheless the
process of fitting the door frame is the same.
Step 11
Parts Needed - No. 18 QTY 12
Lay the remaining boards (
No.18
) onto
the shed between the log cabin and door
frame, ensuring they sit in the groove of
the door frame.
*Ensure that the boards are level and
flush with each other as you lay each
one.
Fix every 6th board
(No.18)
to the log
board of the log cabin, using 2x30mm
screws as shown in the illustration.
4x30mm screws.
30mm
screw
Pre drill
hole
IMPORTANT:
Pre-drill before fixing screws.
18
18
14
17
16
IMPORTANT:
Pre-drill before fixing screws.
30mm
screw
Pre drill
hole
Step 12
Parts Needed - No. 14 QTY 6
No. 16 QTY 6
No. 17 QTY 6
Following the method shown in the
illustration, lay the next 6 boards
(
No. 14, 16 & 17
) onto the shed to
create your second layer, ensuring
that the back log boards
(No.16)
sit
inside the ‘U’ channel.
*Ensure that the boards are level
and flush with each other as you lay
each one.
Secure the back top board
(No.16)
by screwing through the Log board
at an angle into the ‘U’ channel,
using 2x30mm screws.
2x30mm screws.
16